Laserfiche WebLink
<br />1. <br /> <br />The plan shall include, but not be limited to, the following <br />information: <br /> <br />e <br /> <br />a. The specific locations and the estimated beginning and ending <br />dates of all projects to be commenced during the next calendar <br />year (in this Section, a "Next-year Project"); and <br /> <br />b. The tentative locations and beginning and ending dates for all <br />projects contemplated for the first year following the next <br />calendar year (in this Section, a "Five-year Project"). <br /> <br />2. The term "Project" in this Section shall include both Next-year <br />Projects and Five-year Projects. <br /> <br />a. By January 1 of each year the City will have available for <br />inspection in its offices a composite list of all Projects of which <br />it has been informed in the annual plans. All registrants are <br />responsible for keeping themselves apprised of the current <br />status of this list. <br /> <br />b. Thereafter, by February 1, each registrant may change any <br />Project in its list of Next-year Projects, and must notify the <br />City and all other registrants of all such changes in said list. <br />Notwithstanding the foregoing, a registrant may at any time <br />join in a Next-year Project of another registrant that was listed e <br />by the other registrant. <br /> <br />B. Additional Next-vear Proiects. Notwithstanding the foregoing, the City may, <br />for good cause shown, allow a registrant to submit additional Next-year <br />Projects. Good cause includes, but is not limited to, the criteria set forth in this <br />Chapter, concerning the discretionary issuance of permits. <br /> <br />Subd. 6. Permit Requirement. Except as otherwise provided in this Code, no person <br />may obstruct or excavate any Right-of-Way without first having obtained the <br />appropriate Right-of-Way permit from the City to do so. <br /> <br />A. Excavation Permit. An excavation permit is required to allow the holder to <br />excavate that part of the Right-of-Way described in such permit and/or to <br />hinder free and open passage over the specified portion of the Right-of-Way <br />by placing equipment described therein, to the extent and for the duration <br />specified therein. <br /> <br />B. <br /> <br />Obstruction Permit. An obstruction permit is required to allow the holder to <br />hinder free and open passage over the specified portion of Right-of-Way by <br />placing equipment, vehicles, or other obstructions described therein on the <br />Right-of-Way for the duration specified therein. <br /> <br />e <br /> <br />No person may excavate or obstruct the Right-of-Way beyond the date or <br />dates specified in the permit unless such person (1) makes a supplementary <br /> <br />360 - 8 <br />