My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-16-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 07-16-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:41 PM
Creation date
11/13/2006 2:36:51 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br />e . <br />. <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> . <br /> <br />e <br /> <br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />July 11, 2001 <br /> <br />TO: <br /> <br />Joe Lynch; City Administrator <br /> <br />Thomas J. Moore; Acting Public Works Director T TIM. <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Public Works Second Quarter Report <br /> <br />Staff have responded to 42 after hour 'CaIl Outs' <br />Staff have made 239 visits to resident homes and in the process traveled 780 miles, <br />Hired two summer part time workers. <br />Completed spring street sweeping of the entire City <br />Lift Station #8, Ingerson Road & Hamliue A ve.North, was reconstructed <br />Crack sealing completed <br />Seal Coating of 26 streets was completed. Streets were swept clean by Staff. <br />24 mailboxes were repaired/replaced due to snowplow damage. <br />112 turf/curb areas were repaired due to snowplow damage. <br />100% staff participation in the City's 50th Anniversary Celebration. <br />Repaired 5 Sewer Line breaks <br />Repaired 4 Water Line breaks <br />Street repairs due to winter damage are proceeding, 50 % of the work has been <br />completed. Approximately 60 tons of asphalt has been used. <br />Storm water culvert was extended under Thorn Drive. <br />InstaIled new storm water catchbasin at the new City HaIl location, <br />Booster station received a maintenance check-up. <br />Removed fence from the new City Hall location. <br />InstaIled new storm water catchbasin on Venus Avenue. <br />InstaIled a safety video camera on the rear of Snowplow #110. The monitor is <br />located in the cab. AIlows the driver greater vision to rear. <br />Completed seasonal maintenance on all 14 Lift Stations. <br />Staff attended seminars/ workshops on; confined space, water, sewer, and <br />maintenance of Public Works vehicles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.