My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-16-2001
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2001
>
CCP 07-16-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:41 PM
Creation date
11/13/2006 2:36:51 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF ARDEN HILLS <br /> <br />MEMORANDUM <br /> <br />e <br /> <br />DATE: <br /> <br />July 11, 2001 <br /> <br />TO: <br /> <br />Joe Lynch; City Administrator <br /> <br />Thomas J. Moore; Parks & Recreation Director '""\.1. Yv\ <br /> <br />FROM: <br /> <br />SUBJECT: <br /> <br />Parks and Recreation Second Quarter Report <br /> <br />Parks <br /> <br />. Completed a citywide survey of Parks, Trails and Recreation for the Comprehensive <br />Park Plan process, The surveys were mailed to every resident of Arden Hills. The <br />response rate was 15%. <br />. Organized four citywide community meetings for the Comprehensive Park Plan <br />process. <br />. Participated in the City's 50th Anniversary Celebration on June 23. 2001. <br />. Playstructures, complete with safety boxes, were installed at Sampson Park and Floral <br />Park. <br />. Completion of Phase II of the Arden Manor Park improvement project. The following <br />work was completed; a fence around the basketball court, blacktop the access road, <br />final grade and sod laid <br />. Two members were added to the Parks, Trails and Recreation Committee. Total of 10 <br />members. <br />. 38 Birdhouses installed by the Boy Scouts at Crepeau Park. <br />. Trail improvements at Crepeau Nature Preserve <br />. Tree work completed at Sampson Park. Floral Park and Ingerson Park, <br />. Vandalism, graffiti, occurred at Valentine Park, Hazelnut Park and Cummings Park. <br />All incidents were reported to Ramsey County Sheriff. <br />. Safety Fence for team benches installed at Valentine Park <br />. State Mandated bleachers were installed at Perry Park. Hazelnut Park and Floral Park. <br />. Swing Set safety pads installed at Cummings Park and Perry Park <br />. Friends ofthe Parks tree plantings at Sampson Park, Floral Park and Hazelnut Park. <br />. Hired three summer part-time workers, All three worked for the City last year. <br />. Park staff attended workshops/seminars on; small engine repair, Toro lawnmowers, <br />confined space, tree inspection, and weed control. <br />. Adopt-a-Flower Garden program was held on May 19,2001. The program includes <br />16 Gardens and 62 volunteers. <br />. Adopt-a-Park program has 12 volunteers, <br />. Adopt-a.Trail program has 5 volunteers. <br /> <br />e <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.