Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />URS <br /> <br />MEMORANDUM <br /> <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612) 370-13783 <br /> <br />To: <br /> <br />Nick Landwer/URS <br /> <br />File: 37951022 <br /> <br />Joe Lynch/Arden <br />Hills <br /> <br />Copy: <br /> <br />From: Greg Brown, PE <br />Arden Hills City Engineer <br /> <br />Date: April 9,2002 <br /> <br />Subject: PMP Scope 2003 and Beyond <br /> <br />Introduction <br />We have prepared a preliminary scope for the next several years of the City of Arden Hills <br />Pavement Management Program as requested by the Council. This memo outlines the current <br />overall citywide paverncnt needs, outlines the current funding mechanisms and contributions by <br />each to the Pavement Management Program, and outlines a comprehensive approach to the <br />management of pavements within thc City of Arden Hills beginning in 2003 and running <br />through 2008. This memorandum is intended to assist with the discussion of the 2003 PMP and <br />solicit council and staff comments on the proposed course of future PMPs as proposed by the <br />City Engineer. <br /> <br />Arden Hill Pavement Infrastructure Needs <br />The following is a brief synopsis of the current pavement infrastructure needs for the entire city <br />for the purposes of analyzing whether the current annual PMP funding mechanisms and scope is <br />generally mecting the City's needs or not. For the purposes of this macro analysis we have <br />assumed that all streets currently not meeting standards will require full reconstruction <br />($250.00/LF) and all streets with curb and gutter and storm sewer improvements would only <br />require mill and overlay ($50.00/LF). The annualized needs cost assumes that all City streets <br />would be either reconstructed or overlayed over the next twenty years. The analysis assumes all <br />streets to be sealcoated every ten years. <br /> <br />A. Street Reconstruction 13.0 miles <br />B. Street Overlay 17.0 miles <br />C. Street Sealcoat 60.0 miles <br />Total 20 Year PMP (2002 dollars) <br /> <br />$17,200,000 <br />$ 4,500,000 <br />$ 850,000 <br />$22,550,000 <br /> <br />Annualized Budget (2002 dollars) <br /> <br />$ 1,I27,500 <br />