Laserfiche WebLink
<br />. <br /> <br />CIP Memorandum <br />July 10, 2002 <br />Page 2 <br /> <br />2003 Reconstruction of the Ingerson neighborhood in the southeastern portion of the City. This <br />neighborhood continues to exhibit PCI ratings at the bottom of the scale and offer <br />opportunities to significantly increase the water quality of runoff entering Lake Josephine <br />and Lake Johanna. The Edgewater neighborhood includes a number of substandard <br />roadways and accesses as well as significant sanitary sewer issues which will require dig <br />up to repair. <br />Total Estimated Project Cost: $1,540,000 (pavement only) <br /> <br />Mill and Overlay of the Karth Lake neighborhood located northeast of Karth Lake. This <br />neighborhood exhibits the lowest PCI ratings of streets meeting City design standards <br />with curbs and therefore is an excellent candidate for Mill and Overlay. Some areas of the <br />neighborhood may require patching/repair prior to the overlay. <br />Sealcoating of the neighborhoods bound by Snelling A venue, Highway 96,Hamline <br />A venue and Highway 10 <br />Total Estimated Project Cost: $330,000 (pavement only) <br /> <br />. <br /> <br />2004 Reconstruction of the Edgewater neighborhood in the sourheastern portion of the City. <br />This neighborhood also exhibits PCI ratings at the bottom of the scale and offers <br />opportunities to significantly increase the water quality of runoff entering Lake Josephine. <br />The Edgewater neighborhood includes a number of substandard roadways and accesses as <br />well as significant sanitary sewer issues which will require dig up to repair. <br />Total Estimated Project Cost: $450,000 (pavement only) <br /> <br />Reconstruction of West Round Lake Road. This work is contingent upon the <br />development of the NE quadrant of I35W and 1694. Scope of project will depend upon <br />Council decision. State Aid funding eligible. <br />Total Estimated Project Cost: $1,500,000 (pavement only) <br /> <br />2005 Reconstruction of the Ridgewood neighborhood located between Lake Johanna and <br />Snelling A venue. This neighborhood exhibits low PCI ratings and has shown a marked <br />drop in PCI since the last ratings conducted in 1999. Opportunities to improve the water <br />quality of runoff entering Lake Johanna exist in this neighborhood as well. Most of the <br />street network in this neighborhood does not meet City standards. <br />Total Estimated Project Cost: $1,130,000 (pavement only) <br /> <br />. <br /> <br />2006 Mill and Overlay and reconstruction of the Red Fox/Grey Fox commercial area. This <br />project will include the reconstruction of Dunlap Street which currently does not have <br />curb and gutter. Since most abutting properties in this area are commercial, a higher <br />percentage of the project costs should be borne by assessments. State Aid funding <br />eligible. <br />Total Estimated Project Cost: $975,000 (pavement only) <br />Mill and Overlay of Chatham and Brighton Way neighborhoods. These neighborhoods <br />will be rerated in 2005 along with the entire City_ A final decision will be made on <br />priority of mill and overlay neighborhoods will be made after thc 2005 PCI survey. <br />