Laserfiche WebLink
<br />I <br /> <br /> <br />PART I <br />INGERSON NEIGHBORHOOD IMPROVEMENTS <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I' <br />I <br /> <br />A. <br /> <br />Background Summary <br /> <br />The Ingerson neighborhood was first considered for reconstruction in 1999 however <br />the project was tabled by the Council pending a review of the Pavement Management <br />Program, Following the review of the PMP and adoption of a new policy the City <br />Engineer prepared a five year PMP schedule which recommended that the Ingerson <br />neighborhood be considered for reconstruction in 2003, Neighborhood streets that are <br />being considered as a pal1 of this feasibility report are listed as follows: <br /> <br />Street Name <br />Ingerson Road <br />Ingerson Court <br />Fernwood St. <br />Fernwood Ct. <br />Cannon Ave, <br />Carlton Dr. <br />Hamline Ave, (north) <br />Hamline Ave. (south) <br />Tiller Lane <br />Dunlap Street <br />Dellwood <br /> <br />Existing <br />Width <br />27 <br />24 <br />27 <br />26 <br />24-28 <br />30 <br />22 <br />24 <br />30 <br />30 <br />30 <br /> <br />PCI <br />1999 <br />65 <br />37 <br />77 <br />86 <br />44 <br />63 <br />11 <br />59 <br /> <br />Proposed <br />Width <br />28 <br />24 <br />28 <br />24 <br />28 <br />28 <br />28 <br />28 <br /> <br />*These roadways were constructed during or prior to 1961 <br /> <br />Notes: <br /> <br />PCI <br />2002 <br />47 <br />47 <br />70 <br />75 <br />10 <br />60 <br />1 <br />36 <br />83 <br />83 <br />83 <br /> <br />Last Significant <br />Road Work <br />1988 <br />1961* <br />1989 <br />1989 <br />1961* <br />1961* <br />1961* <br />1987 <br />1990 <br />1990 <br />1990 <br /> <br />a) Tiller Lane, Dunlap Street and Dellwood are located within the Ingerson <br />neighborhood however were reconstructed with curb and gutter and storm sewer <br />approximately 10 years ago and are therefore not being considered for further <br />improvements at this time, <br /> <br />b) Reconstruction of Fernwood Court is included as an alternative <br /> <br />c) Reconstruction of Hamline Avenue (north) is included as an alternative <br /> <br />The neighborhood as a whole is ranked as the high priority for reconstruction based <br />upon the 2002 street condition assessment and existing drainage issues, water quality, <br />utility issues, pavement standards and safety issues, The streets identified for <br />improvement have PCI ratings between 1 and 75 with a weighted average of 42, <br /> <br />5 <br />