Laserfiche WebLink
<br />Total construction cost estimate for a 6 foot wood chip trail is approximately $41,500 <br />Total construction cost estimate for a 6 foot bituminous trail is approximately $91,500 <br />Total construction cost estimate for an 8 foot bituminous trail is approximately $ 106,500 <br /> <br />? <br /> <br />The City Engineer requests that the Council direct staff whether or not to <br />incorporate a trail into the project and specify its width, surface and if parking is <br />desired at the Roseville border. <br /> <br />12 <br /> <br />I <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />