My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-12-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 11-12-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:16:59 PM
Creation date
11/13/2006 4:02:07 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br /> <br />PART II <br />KARTH LAKE EAST NEIGHBORHOOD IMPROVEMENTS <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />A. <br /> <br />Background Summary <br /> <br />The Karth Lake East was identified for pavement rehabilitation in 2003 as a part of the <br />five'year PMP schedule devcloped by the City Engineer in the Spring of 2002. This <br />neighborhood includes streets that meet City standards for width, curb and gutter and <br />drainage infrastructure and is therefor been identified for overlay, Neighborhood streets <br />that are being considered as a part of this feasibility report are listed as follows: <br /> <br />Street Name <br />Karth Lake Road <br />Pleasant Circle <br />Amble Circle <br />Pleasant Drive (N,S) <br />Pleasant Drive (E,W) <br />Amble Drive <br /> <br />PCl <br />2002 <br />65 <br />63 <br />72 <br />59 <br />26 <br />89 <br /> <br />Notes: <br /> <br />Last Significant <br />Road Work <br />1978 <br />1978 <br />1978 <br />1978 <br />1978 <br />1994 <br /> <br />Proposed <br />Improvement <br />M&O <br />M&O <br />M&O <br />M&O <br />Reconstruct <br />Nothing <br /> <br />a) Amble Drive is located within the Karth Lake East neighborhood however was <br />reconstructed with curb and gutter and stonn sewer approximately 8 years ago and <br />is therefore not being considered for further improvements at this time. <br /> <br />b) The east-west segment of Pleasant Drive is significantly more deteriorated than the <br />neighborhood streets as a whole as is evident in its PCl rating. For this reason, it is <br />recommended to be reconstructed as a part of this project. Mill & Overlay of this <br />segment of Pleasant Drive is included as an alternative for Council consideration. <br /> <br />The neighborhood as a whole is ranked as the highest priority for mill and overlay <br />rehabilitation based upon the 2002 street condition assessment. All of the project streets <br />with the exception of the east west segment of Pleasant Drive have PCl ratings in the <br />lower part of the overlay range, The goal of efficient pavement management is to <br />rehabilitate pavements with relatively low cost overlays when PCl ratings are in the <br />range of 60,80, Once pavement PCls drop below 60 the annual rate of deterioration <br />increases often to a point where overlays are not effective and reconstruction is <br />necessary, The City Engineer assesses street conditions on a three year cycle is to <br />identify streets and neighborhoods which are approaching this zone of opportunity, The <br />project streets recommended for mill and overlay have PCl ratings between 59 and 72, <br /> <br />The east-west segment of Pleasant Drive has a PCl of 26 which is significantly lower <br />than the other streets and well within the typical range of reconstruction, This segment <br />also exhibits a significant amount of misaligned curb and gutter (approximately 30% of <br />the total) creating numerous "birdbaths" after rain events, Although it is possible to <br />repair only the curb segments which have settled, this cost per foot is typically three <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.