Laserfiche WebLink
<br />I <br />~B. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />Project Funding <br /> <br />The project will be funded from several sources including Residential Assessments on <br />the benefiting properties, the City General Fund, MnDOT State Aid Funds, the City <br />Water Utility Fund, the City Surface Water Utility Fund, the City Parks Fund and a <br />potential grant from Rice Creek Watershed, We have calculated three general <br />reconstruction assessment rates based upon reconstruction of a 24 foot street, 28 foot <br />street, 32 foot street. We have calculated two general Mill and Overlay rates to account <br />for the typical Mill and Overlay effort and the special case of Pleasant Drive, The <br />proposed assessment rates are based on Y2 the cost of the roadway improvement cost. <br />Assessment front footages were calculated using the Arden Hills Assessment <br />Guidelines Dated: November 1990, In most cases the eul,de,sac formula was used <br />di viding the area of the lot by the average depth of the lot. Comer lot Front Footages <br />are based on the lot frontage abutting the road being constructed, These two <br />neighborhoods included a number of unusual lot configurations which do not fit nicely <br />into existing formulae, We have calculated front footages in these cases using our best <br />judgement and plan to present our specific calculations to Council and residents in the <br />future, <br /> <br />Total Project Cost Based Upon Recommended Improvements: <br /> <br />$2,553,900,00 <br /> <br />Proposed Funding Sources: <br />General Fund $ <br />PIR Fund (Assessments): $ <br />Surface Water Utility Fund: $ <br />Rice Creek Watershed Grant: $ <br />MnDOT State Aid Funds (2003 Estimated Account Balance $1,000,000) $ <br /> <br />700,000,00 <br />822,213.04 <br />250,000,00 <br />75,000,00 <br />706,686,96 <br /> <br />Total <br /> <br />$2,553,900,00 <br /> <br />Total Hamline Trail Project Cost: <br /> <br />$ 106,500,00 <br /> <br />Proposed Funding Sources: <br />MnDOT State Aid Funds <br />Water Utility <br />Parks Funds <br /> <br />$ 50,000,00 <br />$ 12,500,00 <br />$ 44,000,00 <br /> <br />Total <br /> <br />$ 106,500,00 <br /> <br />17 <br />