Laserfiche WebLink
<br />I <br /> <br /> City of Arden Hills <br /> 2003 Street Reconstruction Program <br /> FERNWOOD STREET I <br /> FULL RECONSTRUCT, 315 FEET <br /> (BASED ON 28' F-F) <br /> Unit I <br />No, Item Unit Quantity Price Extension I <br />1 Mobilization LS 1.0 $ 2,200.00 $ 2,200.00 <br />2 Bituminous Pavement Removal SY 1,050,0 $ 2,00 $ 2,100,00 I <br />3 Miscellaneous Removals LS 0.1 $ 20,000,00 $ 2,000,00 <br />4 Common Excavation CY 793.0 $ 6,50 $ 5,200.00 I <br />5 Select Granular Base (12") CY 397.0 $ 12,00 $ 4,800,00 <br />6 Aggregate Base CL 5 (8") CY 264,0 $ 14,00 $ 3,700,00 <br />7 Bituminous Base Course (2") TQN 115.0 $ 42,00 $ 4,800.00 I <br />8 Bituminous Wear Course (2") TON 115,0 $ 48.00 $ 5,500,00 <br />9 Bituminous Material for Tack Coat GAL 50,0 $ 1.90 $ 100,00 <br />10 Concrete Curb and Gutter LF 640,0 $ 8.00 $ 5,100.00 .. <br />II Traffic Control LS 0,05 $ 25,000,00 $ 1,300,00 <br />12 Signage SF 18,0 $ 30,00 $ 500.00 <br />13 Sodding SY 1,410.0 $ 3,00 $ 4,200,00 I <br />14 Driveway Removal SY 68,0 $ 5,00 $ 300,00 <br />15 Bituminous Pavement (Driveway) SY 40,0 $ 25,00 $ 1,000,00 I <br />16 Concrete Pavement (Driveway) SY 58,0 $ 40,00 $ 2,300,00 <br />17 Sawing Concrete Pavement LF 10.0 $ 5,00 $ 100,00 <br />18 Sawing Bituminous Pavement LF 24,0 $ 2,00 $ 100.00 I <br /> 10% Contingency $ 4,500,00 I <br /> SUBTOTAL $ 49,800,00 <br /> 26% Indirect Cost and Capitalized Interest $ 12,900,00 I <br /> Total Estimated Project Cost - $ 62,700.00 I <br /> I <br /> , <br /> I <br /> <br />