Laserfiche WebLink
<br />I <br /> <br /> City of Arden Hills <br /> 2003 Street Reconstruction Program <br /> INGERSON COURT <br />I FULL RECONSTRUCT, 480 FEET <br /> (BASED ON 24' F-F) <br />I Unit <br /> No. Item Unit Quantitv Price Extension <br />I <br />1 Mobilization 1.0 $ 3,000,00 $ 3,000,00 <br /> LS <br />I 2 Bituminous Pavement Removal SY 1,280,0 $ 2,00 $ 2,600.00 <br />3 Miscellaneous Removals LS 0,05 $ 20,000,00 $ 1,000.00 <br /> 4 Common Excavation CY 1,067,0 $ 6,50 $ 6,900,00 <br />I 5 Select Granular Base (12") CY 533.0 $ 12,00 $ 6,400,00 <br />6 Aggregate Base CL 5 (8") CY 356.0 $ 20,00 $ 7,100,00 <br /> 7 Bituminous Base Course (2") TON 147,0 $ 42.00 $ 6,200,00 <br />I 8 Bituminous Wear Course (2") TON 147,0 $ 48,00 $ 7,100,00 <br />9 Bituminous Material for Tack Coat GAL 64,0 $ 1.90 $ 100.00 <br />It 10 Concrete Curb and Gutter LF 910,0 $ 8,00 $ 7,300.00 <br />11 Traffic Control LS 0.05 $ 25,000,00 $ 1,300.00 <br /> 12 Signage SF 9,0 $ 30,00 $ 300.00 <br />I 13 Sodding SY 2,675,0 $ 3,00 $ 8,000,00 <br />14 Driveway Removal SY 174,0 $ 5,00 $ 900,00 <br /> 15 Bituminous Pavement (Driveway) SY 126,0 $ 25,00 $ 3,200,00 <br />I 16 Concrete Pavement (Driveway) SY 78,0 $ 40,00 $ 3,100,00 <br />17 Sawing Concrete Pavement LF 16,0 $ 5,00 $ 100,00 <br />I 18 Sawing Bituminous Pavement LF 46,0 $ 2,00 $ 100,00 <br /> 10% Contingency $ 6,500,00 <br />I SUBTOTAL $ 71,200,00 <br />I 26% Indirect Cost and Capitalized Interest $ 18,500,00 <br />I Total Estimated Project Cost - $ 89,700.00 <br />I <br />,. <br />I <br /> <br />