Laserfiche WebLink
<br />I <br /> <br /> City of Arden Hills <br /> 2003 Street Reconstruction Program <br /> FERNWOOD COURT I <br /> AL TERNA TE III, FULL RECONSTRUCT (210 FEET) <br /> (BASED ON 24' F-F) I <br /> Unit <br />No. Item Unit Ouantitv Price Extension I <br />1 Mobilization LS 1.00 $ 2,300,00 $ 2,300,00 <br />2 Bituminous Pavement Removal SY 950,00 $ 2,00 $ 1,900.00 I <br />3 Miscellaneous Removals LS 0,05 $ 20,000.00 $ 1,000.00 <br />4 Common Excavation CY 787.00 $ 6,50 $ 5,100,00 I <br />5 Select Granular Base (12") CY 393.00 $ 12,00 $ 4,700.00 <br />6 Aggregate Base CL 5 (8") CY 262,00 $ 20,00 $ 5,200,00 <br />7 Bituminous Base Course (2") TON 108,00 $ 42.00 $ 4,500.00 I <br />8 Bituminous Wear Course (2") TON 108,00 $ 48.00 $ 5,200,00 <br />9 Bituminous Material for Tack Coat GAL 47.00 $ 1.90 $ 100,00 <br />10 Concrete Curb and Gutter LF 655,00 $ 8.00 $ 5,200,00 .. <br />11 Traffic Control LS 0,05 $ 25,000,00 $ 1,300,00 <br />12 Signage SF 9,00 $ 30,00 $ 300.00 I <br />13 Sodding SY 1,615,00 $ 3.00 $ 4,800,00 <br />14 Driveway Removal SY 95.00 $ 5,00 $ 500.00 <br />15 Bituminous Pavement (Driveway) SY 134.00 $ 25,00 $ 3,400.00 I <br />16 Concrete Pavement (Driveway) SY 30,00 $ 40,00 $ 1,200,00 <br />17 Sawing Bituminous Pavement LF 32.00 $ 2,00 $ 100.00 <br /> 10% Contingency $ 4,700.00 I <br /> SUBTOTAL $ 51,500,00 I <br /> 26% Indirect Cost and Capitalized Interest $ 13,400.00 <br /> I <br /> Total Estimated Project Cost - $ 64,900.00 I <br /> I <br /> , <br /> I <br /> <br />