|
<br />City of Arden Hills
<br />2003 Street Reconstruction Program
<br />
<br /> HAMLINE A VENUE
<br /> DRAINAGE IMPROVEMENTS
<br /> Unit
<br />No, Item Unit Quantity Price Extension
<br />1 Mobilization LS 1.0 $ 7,000.00 $ 7,000,00
<br />2 24" RCP LF 520.0 $ 40,00 $ 20,800,00
<br />3 36" RCP LF 120.0 $ 45.00 $ 5,400,00
<br />4 24" Pipe Apron EA 13.0 $ 500,00 $ 6,500,00
<br />5 36" Pipe Apron EA 1.0 $ 800,00 $ 800,00
<br />6 Catch Basin (2' x 3') EA 8,0 $ 1,200,00 $ 9,600,00
<br />7 Manhole Catch Basin (48") EA 4,0 $ 2,999.00 $ 12,000,00
<br />8 Manhole Catch Basin (60") EA 2,0 $ 3,000,00 $ 6,000,00
<br />9 Area Drain EA 1.0 $ 500.00 $ 500.00
<br />10 Common Channel Excavation CY 3,300.0 $ 10.00 $ 33,000,00
<br />11 River Run Boulders, Class III CY 150,0 $ 120,00 $ 18,000,00
<br />12 Construct Raingarden EA 2,0 $ 5,000.00 $ 10,000,00
<br />13 Landscaping Allowance LS 1.0 $ 25,000.00 $ 25,000,00
<br /> 10% Contingency $ 15,500.00
<br /> SUBTOTAL $ 185,600,00
<br /> 26% Indirect Cost and Capitalized Interest $ 48,300,00
<br />
<br />Total Estimated Project Cost-
<br />
<br />$ 233,900.00
<br />
<br />I
<br />
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />tI
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />,
<br />I
<br />
|