Laserfiche WebLink
<br />I <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />It <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br /> <br />No, <br /> <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br /> <br /> City of Arden Hills <br />2003 Street Reconstruction Program <br /> PLEASANT DRIVE <br />EAST-WEST SECTION <br />AL TERNA TE II, FULL RECONSTRUCTION (583 FEET) <br /> (BASED ON 32' F-F) <br /> Unit <br />Item Unit Quantitv Price Extension <br />Mobilization LS 1.00 $ 5,800.00 $ 5,800,00 <br />Bituminous Pavement Removal SY 2,848,00 $ 2,00 $ 5,700,00 <br />Miscellaneous Removals LS 0,05 $ 20,000,00 $ 1,000,00 <br />Common Excavation CY 2.197,00 $ 6,50 $ 14,300,00 <br />Select Granular Base (12") CY 1,098,00 $ 12,00 $ 13,200.00 <br />Aggregate Base CL 5 (8") CY 732,00 $ 20,00 $ 14,600.00 <br />Bituminous Base Course (2") TON 334.00 $ 42,00 $ 14,000,00 <br />Bituminous Wear Course (2") TON 334,00 $ 48,00 $ 16,000,00 <br />Bituminous Material for Tack Coat GAL 146,00 $ 1.90 $ 300,00 <br />Concrete Curb and Gutter LF 1,474,00 $ 8.00 $ 11,800,00 <br />Traffic Control LS 0,05 $ 25,000.00 $ 1,300,00 <br />Signage SF 9,00 $ 30.00 $ 300,00 <br />Sodding SY 1,615,00 $ 3,00 $ 4,800,00 <br />Driveway Removal SY 500,00 $ 5,00 $ 2,500,00 <br />Bituminous Pavement (Driveway) SY 400,00 $ 25,00 $ 10,000.00 <br />Concrete Pavement (Driveway) SY 100,00 $ 40,00 $ 4,000,00 <br />Sawing Bituminous Pavement LF 400.00 $ 2,00 $ 800,00 <br />Sawing Concrete Pavement LF 200.00 $ 5,00 $ 1,000,00 <br />10% Contingency $ 12,100,00 <br />SUBTOTAL $ 133,500.00 <br />26% Indirect Cost and Capitalized Interest $ 34,700,00 <br /> <br />Total Estimated Project Cost - <br /> <br />$ 168,200.00 <br />