Laserfiche WebLink
<br />I <br /> <br /> <br />I <br />I <br /> No, <br />I 1 <br /> 2 <br />I 3 <br />4 <br />I 6 <br />7 <br /> 8 <br />I 9 <br />It <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />I <br />-------..- <br /> <br />City of Arden Hills <br />2003 Street Reconstruction Program <br /> <br />KARTH LAKE NEIGHBORHOOD DRAINAGE IMPROVEMENTS <br />(PLEASANT DRIVE AND AMBLE DRIVE) <br /> <br /> Unit <br />Item Unit Ouantity Price Extension <br />Mobilization LS 1.0 $ 4,100,00 $ 4,100,00 <br />Connect to Existing Storm Sewer EA 1.0 $ 1,500,00 $ 1,500,00 <br />12" RCP LF 150.0 $ 25.00 $ 3,800,00 <br />Catch Basin (2' x 3') EA 1.0 $ 1,200.00 $ 1,200,00 <br />Manhole (60") EA 1.0 $ 3,000.00 $ 3,000,00 <br />Check Valve EA 1.0 $ 300.00 $ 300,00 <br />Vortex Separators EA 3,0 $ 22,000,00 $ 66,000,00 <br />Pavement Restoration LS 1.0 $ 5,000,00 $ 5,000,00 <br />10% Contingency $ 8,500,00 <br />SUBTOTAL $ 101,900.00 <br />26% Indirect Cost and Capitalized Interest $ 26,500,00 <br /> <br />Total Estimated Project Cost" <br /> <br />$ 128,400.00 <br />