Laserfiche WebLink
<br />City of Arden Hills <br />2003 Street Reconstruction Program <br /> <br />AMBLE CIRCLE <br />MILL AND OVERLAY, 153 FEET <br /> <br /> Unit <br />No. Itcm Unit Quantity Price Extension <br />1 Mobilization LS 1.0 $ 300.00 $ 300,00 <br />2 Mill Bituminous Surface, 2" SY 210.0 $ 1.50 $ 300,00 <br />3 2" Bituminous Overlay SY 520.0 $ 6.00 $ 3,100,00 <br />4 Bituminous Spot Repair SY 15.0 $ 20,00 $ 300,00 <br />5 Spot Curb and Gutter Repair EA 20,0 $ 25,00 $ 500,00 <br />6 Traffic Control LS 0,05 $ 25,000,00 $ 1,300,00 <br /> 10% Contingency $ 600,00 <br /> SUBTOTAL $ 6,400,00 <br /> 26% Indirect Cost and Capitalized Interest $ 1,700,00 <br /> <br />Total Estimated Project Cost" <br /> <br />$ <br /> <br />8,100.00 <br /> <br />I <br /> <br />~ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />4\ <br />I <br />