Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />.. <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />2.11.02 <br /> <br />Planning-level estimates of capital expenditures has been made. Future <br />anticipated projects are also listed. The activities have been distributed <br />throughout a 10-year implementation plan extending though 2011. <br /> <br />The Capital Improvement Plan (CIP) is summarized in Table 7. <br /> <br />Table 7 <br /> <br />Capital Improvement Plan <br /> <br /> Preliminary <br />Project Project Cost Date(s) of <br />Location Project Description Estimate Implementation Comments <br />Evaluation of Evaluation of existing water quality $60,000 2003-2004 <br />City's Water treatment for all subwatersheds <br />Quality Treatment <br />Feasibility Study Preliminary engineering and design $38,000 1 Cost does not include <br />for Pond P-? surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $14,000 1 Cost does not include <br />for Pond P-8 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $14,000 1 Cost does not include <br />for Pond P-10 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $14,000 , Cost does not include <br />for Pond P-" surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $26,000 1 Cost does not include <br />for Pond P-'2 surveying of ponds in <br /> drainage system' <br />Feasibility Study Preliminary engineering and design $28,000 2 Cost does not include <br />for Pond P-2 surveying ot ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $38,000 2 Cost does not include <br />for Pond P-3 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $38,000 2 Cost does not include <br />for Pond P-4 surveying of ponds in <br /> drainage system <br />Feasibiiity Study Preliminary engineering and design $26,000 3 Cost does not include <br />for Pond p-s surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $19,000 3 Cost does not include <br />for Pond P-6 surveying of ponds in <br /> drainage system <br />Feasibility Study Preliminary engineering and design $33,000 3 Cost does not include <br />for Pond P-9 surveying of ponds in <br /> drainage system <br />Feasibility Study $288,000 <br />Subtotai <br /> <br />City of Arden Hills, Minnesota <br />Local Water Resource Management Plan <br /> <br />A-ARDEN0101.00 <br />Page 43 <br /> <br />. <br /> <br />. <br /> <br />. <br />