My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-19-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 02-19-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:05 PM
Creation date
11/13/2006 4:03:04 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />Ie <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />" <br />I <br />I <br />I <br />I <br />I <br />J <br />\t <br />I <br />I <br /> <br />2.11.02 <br /> <br /> Table 7 (Continued) <br />Project Project Description Preliminary Date(s) of Comments <br />Location Description Project Cost Implementation <br /> Estimate <br />Pond P-7 Regional pond, includes $337,000 1 <br /> engineering and construction <br /> costs <br />Pond P.8 Regionai pond, includes $146,890 1 <br /> engineering and construction <br /> costs <br />Pond P-10 Regional pond, includes $146,890 1 <br /> engineering and construction <br /> costs <br />Pond P-11 Regional pond, includes $149,620 1 <br /> engineering and construction <br /> costs <br />Pond P-12 Regional pond, includes $239,370 1 <br /> engineering and construction <br /> costs <br />Pond P-2 Regional pond, includes $260,470 2 <br /> engineering and construction <br /> costs <br />Pond P-3 Regional pond, includes $337,000 2 <br /> engineering and construction <br /> costs <br />Pond P.4 Regional pond, includes $337,000 2 <br /> engineering and construction <br /> costs <br />Pond P-5 Regional pond, includes $239,370 3 <br /> engineering and construction <br /> costs <br />Pond P-6 Regional pond, includes $190,420 3 <br /> engineering and construction <br /> costs <br />Pond p-g Regional pond, includes $293,750 3 <br /> engineering and construction <br /> costs <br />Regional Pond Construction Subtotal $2,6n,780 <br />Total $3,020,780 <br /> <br />The Plan anticipates some kind of stOfmwater activities at all locations. The Plan has identified stormwater <br />ponds for the purpose of developing cost estimates and budgeting purposes only. This should not be <br />interpreted as a commitment by the City to build a pond at all of these locations, especially where private <br />property is involved, or in the case of the pond shown at Valentine Park. <br /> <br />City of Arden Hills, Minnesota <br />Local Stormwater Management Plan <br /> <br />A-ARDEN0101.00 <br />Page 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.