Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2.11.02 <br /> <br />The Implementation Plan is not a hard and fast commitment to complete each <br />and every activity in the time trame suggested. Rather, it is a suggested course <br />of action that will accomplish the major goal of this plan, to accommodate <br />growth and redevelopment in the community while protecting the <br />environment and water resources. <br /> <br />. <br /> <br />The Capital Improvement Plan was developed based on RCWD's Tier <br />classifications for the lakes in Arden Hills. The scheduling of these projects <br />should be coordinated with the City's Pavement Management Program <br />(PMP). <br /> <br />The fIrst item in the Capital Improvement Plan that should be completed is an <br />evaluation of the existing water quality treatment for each subwatershed to <br />determine which subwatersheds meet NURP standards. This can be used to <br />determine areas which do not have sufficient water quality treatment and can <br />be used as a tool to prioritize the other projects listed in the CIP. <br /> <br />The cost estimate for the construction of the proposed ponds does not include <br />land acquisition or easement acquisition. The cost also does not take into <br />account if a feasible study will be completed. The cost does include the larger <br />construction items such as excavation and restoration, and engineering and <br />administrative costs. The final project cost may change based on the <br />determination of scope of work. The Plan anticipates some kind of stormwater <br />activities at all locations. The Plan has identified stormwater ponds for the <br />purpose of developing cost estimates and budgeting purposes only. This <br />should not be interpreted as a commitment by the City to build a pond at all of <br />these locations, especially where private property is involved, or in the case of <br />the pond shown at Valentine Park. <br /> <br />. <br /> <br />Table 8 includes annual operating and maintenance costs, which are separate <br />from capital expenditures. <br /> <br />Table 8 <br /> <br />A <br /> <br />c <br /> <br /> nnual OperatinCl osts <br />Project Project Preliminary Date(s) of Comments <br />Location Description Project Cost Implementation <br /> Estimate <br />Public Updating and managing web page, $10,000 Annual <br />Education and distribution of newsletter <br />Maintenance Annual maintenance of ponds and $40,000 Annual <br />of Ponds and ditches, including dredging when <br />Ditches necessarv <br />Street Sweeping the streets twice a year $30,000 Annual Assumes City labor and <br />Sweeping equipment, no contract <br /> sweeDina. <br /> <br />The Implementation Plan should be reviewed on an annual basis. At that time, <br />each proposed improvement is to be reconsidered, City budgets adjusted, and <br />additional improvements added to the program. <br /> <br />. <br /> <br />City of Arden Hills, Minnesota <br />Local Water Resource Management Plan <br /> <br />A-ARDEN0101.00 <br />Page 45 <br />