Laserfiche WebLink
<br />Gatewav Business Center - Arden Hills. MN <br /> <br />EAW <br /> <br />September 2001 <br /> <br />and removal of the buildings will be conducted in accordance with environmental <br />regulations, e <br /> <br />Municipal solid waste will be generated on-site and will be hauled to licensed landfill <br />sites, The development will follow the guidelines for solid waste and recycling as <br />required by the City of Arden Hills and Ramsey County. Hazardous waste produeed, <br />if any, will be disposed of as required by law, <br /> <br />b. Identify any toxic or hazardous materials to be used or present at the site and identify <br />measures to be used to prevent them from contaminating groundwater. If the use of toxic or <br />hazardous materials will lead to a regulated waste, discharge or emission, discuss any <br />alternatives considered to minimize or eliminate the waste, discharge or emission. <br /> <br />The use of toxic or hazardous materials is not anticipated to be associated with this <br />development. <br />c. Indicate the number, location, size and use of any above or below ground tanks to store <br />petroleum products or other materials, except water. Describe any emergency response <br />containment plans. <br /> <br />No above or below ground tanks storing petroleum products or other materials are <br />anticipated to be associated with this development. <br /> <br />21. <br /> <br />Traffic. Provide an estimate of the impact on traffic congestion on affected roads and describe any <br />traffic improvements necessary. If the project is within the Twin Cities metropolitan area, discuss its <br />impact on the regional transportation system. <br /> <br />e <br /> <br />Number of parking spaces proposed: <br /> <br />Parking Spaces: <br /> <br />1,069 - 2,351 spaces, <br />Off-street parking will be provided as a <br />combination of surface parking. parking underneath <br />the office building and structure parking. Parking <br />will be provided at a ratio of five (5) parking spaces <br />per one thousand (1,000) square feet of gross floor <br />area (total GFAx 95%), <br /> <br />Existing parking spaces (if project involves expansion): <br /> <br />The existing parking spaces will be removed, <br /> <br />Estimated maximum peak hour traffic generated (if known) and time of occurrence: <br /> <br />Note that only the upper range of the proposed development has been analyzed to <br />reflect worst-case traffie impacts, For the upper range of development. 750 vehicle <br />trips will be generated during each of the a.m. and p,m, peak hours, <br /> <br />e <br /> <br />Estimate of impact on traffic congestion on affected roads: <br /> <br />Page 22 <br />