Laserfiche WebLink
<br />I <br />I City of Arden Hills e <br /> 2002 Pavement Management Program <br />I <br /> Option B: Waldon Place Construction <br /> (28' F-F with 40' Radius) <br />I ROADWAY COSTS <br /> Unit <br />No. Item Unit Quantity Price Extension <br />I 1 Mobilization LS 1 $ 2,100.00 $ 2,100.00 <br />2 Remove Bituminous Pavement SY 1345 $ 2.00 $ 2,690.00 <br /> 3 Remove Concrete Curb and Gutter LF 564 $ 2.00 $ 1,128.00 <br />I 4 Driveway Removal SY 196 $ 2.00 $ 392.00 <br />5 Miscellaneous Removals LS 1 $ 2,000.00 $ 2,000.00 <br />6 Common Excavation CY 527 $ 7.00 $ 3.689.00 <br /> 7 Subgrade Excavation CY 80 $ 12.00 $ 960.00 <br />I 8 Select Granular Base (12") CY 316 $ 12.00 $ 3.792.00 <br />9 Aggregate Base CL. V (8") CY 211 $ 14.00 $ 2.954.00 <br /> 10 Bituminous Base Course (2") TON 109 $ 32.00 $ 3,488.00 <br />I 11 Bituminous Wear Course (2") TON 109 $ 35.00 $ 3.815.00 <br />12 Bituminous Material for Tack Coat GAL 48 $ 1.90 $ 91.20 <br />13 Concrete Curb and Gutter LF 501 $ 8.25 $ 4,133.25 <br /> 14 Traffic Control LS 1 $ 1,000.00 $ 1.000.00 <br />I 15 Stop Sign EA 1 $ 250.00 $ 250.00 <br />16 Mail Box Relocation EA 7 $ 50.00 $ 350.00 <br /> 17 Sodding SY 668 $ 4.00 $ 2,672.00 <br />I 18 Bituminous Pavement (Driveway) SY 126 $ 25.00 $ 3.150.00 <br />19 Concrete Pavement (Driveway) SY 70 $ 40.00 $ 2.800.00 . <br />20 Sawing Bituminous Pavement LF 126 $ 2.00 $ 252.00 <br /> Subtotal Construction Cost $ 41.706.45 <br />I 10% Contingency $ 4. I 70.65 <br />I Subtotal Construction Cost w/Contingency $ 45,877.10 <br /> 26% Indirect Cost and Capitalized Interest $ 11.928.04 <br /> Total Estimated Roadway Cost $ 57,810.00 <br />I DRAINAGE IMPROVEMENTS <br />I Unit <br />No. Item Unit Quantity Price Extension <br /> 1 Drainage Improvements LS I $ 5,000.00 $ 5.000.00 <br />I 2 4" PVC Subdrain LF 150 $ 4.50 $ 675.00 <br /> Subtotal Construction Cost $ 5,675.00 <br /> 10% Contingency $ 567.50 <br />I Subtotal Construction Cost w/Contingency $ 6,242.50 <br /> 26% Indirect Cost and Capitalized Interest $ 1.623.05 <br />I Total Estimated Drainage Improvements Cost $ 7,870,00 <br />I Total Estimated Cost $ 65,680.00 . <br />I <br />