My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-29-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 04-29-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:10 PM
Creation date
11/13/2006 4:03:42 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I City of Arden Hills e <br /> 2002 Street Reconstruction Program <br />I <br /> Option C: Waldon Place Construction <br /> (32' F-F with 50' Radius) <br />I ROADWAY COSTS <br /> Unit <br />No. Item Unit Quantity Price Extension <br />I 1 Mobilization LS I $ 2.500.00 $ 2.500.00 <br />2 Remove Bituminous Pavement SY 1345 $ 2.00 $ 2,690.00 <br /> 3 Remove Concrete Curb and Gutler LF 564 $ 2.00 $ 1,128.00 <br />I 4 Driveway Removal SY 196 $ 2.00 $ 392.00 <br />5 Miscellaneous Removals LS I $ 2.000.00 $ 2.000.00 <br />6 Common Excavation CY 732 $ 7.00 $ 5,124.00 <br /> 7 Subgrade Excavation CY 80 $ 12.00 $ 960.00 <br />I 8 Select Granular Base (12") CY 439 $ 12.00 $ 5.268.00 <br />9 Aggregate Base CL- V (8") CY 293 $ 14.00 $ 4,102.00 <br /> 10 Bituminous Base Course (2") TON 151 $ 32.00 $ 4.832.00 <br />I 11 Bituminous Wear Course (2") TON 151 $ 35.00 $ 5.285.00 <br />12 Bituminous Material for Tack Coat GAL 66 $ 1.90 $ 125.40 <br />13 Concrete Curb and Gutter LF 564 $ 8.25 $ 4.653.00 <br /> 14 Traffic Control LS 1 $ 1,000.00 $ 1,000.00 <br />I 15 Stop Sign EA 1 $ 250.00 $ 250.00 <br />16 Mail Box Relocation EA 7 $ 50.00 $ 350.00 <br /> 17 Sodding SY 626 $ 4.00 $ 2.504.00 <br />I 18 Bituminous Pavement (Driveway) SY 126 $ 25.00 $ 3,150.00 <br />19 Concrete Pavement (Driveway) SY 70 $ 40,00 $ 2.800.00 e <br />20 Sawing Bituminous Pavement LF 126 $ 2.00 $ 252.00 <br /> Subtotal Construction Cost $ 49,365.40 <br />I 10% Contingency $ 4.936.54 <br />I Subtotal Construction Cost w/Contingency $ 54,301.94 <br /> 26% Indirect Cost and Capitalized Interest $ 14.118.50 <br /> Total Estimated Roadway Cost $ 68,420,00 <br />I DRAINAGE IMPROVEMENTS COST <br /> Unit <br />I No. Item Unit Quantity Price Extension <br /> 1 Drainage Improvements LS 1 $ 5,000.00 $ 5,000.00 <br />I 2 4" PVC Subdrain LF 150 $ 4.50 $ 675.00 <br /> Subtotal Construction Cost $ 5.675.00 <br /> 10% Contingency $ 567.50 <br />I Subtotal Construction Cost w/Contingency $ 6.242.50 <br /> 26% Indirect Cost and Capitalized Interest $ 1.623.05 <br />I Total Estimated Drainage Improvements Cost $ 7,870,00 <br />I Total Estimated Project Cost $ 76,290.00 . <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.