My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-29-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 07-29-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:18 PM
Creation date
11/13/2006 4:04:47 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />City of Arden Hills <br /> <br />Chapter 11 Snbdivisions <br /> <br />B. If the report of the planning commission has not been received within <br /> <br />seventy-five (75) days, after referral of the matter to the planning <br /> <br />commission, the Council may act on the preliminary plan without the <br /> <br />report. <br /> <br />Subd. 4 Approval and Denial. If the preliminary plan is not approved by the City <br /> <br />Council, the reasons for such action shall be recorded in the proceedings of the Conncil <br /> <br />and transmitted to the applicant. If the preliminary plan is approved, approval shall <br /> <br />not constitute final acceptance of the subdivision. <br /> <br />1110.04 Qualifications Governing Approval. <br /> <br />Subd. 1 Revision. The City Council may require snch changes or revisions as it deems <br /> <br />necessary for the health, safety, general welfare and convenience ofthe City. <br /> <br />Subd. 2 Scope. The approval of a preliminary plan by the Council is tentative only, <br /> <br />involving merely the general acceptability of the layout as submitted. <br /> <br />Snbd.3 Additional Approval Required. Subsequent approval will be required of the <br /> <br />engineering proposals pertaining to water supply, storm drainage, sewerage and <br /> <br />sewage disposal, gas and electric service, grading, gradients and roadway widths and <br /> <br />11 - 18 <br />Public Hearing Draft <br />
The URL can be used to link to this page
Your browser does not support the video tag.