My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-16-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-16-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:25 PM
Creation date
11/13/2006 4:05:43 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ALTERNATIVES CONSIDERED <br /> <br />. <br /> <br />Three future-year geometric alternatives were considered for the North 1-35W Corridor: <br /> <br />1. Baseline (no additional lanes on 1-35W) <br />2. One new through-lane in each direction on 1-35W <br />3. Two new through-lanes in each direction on 1-35W <br /> <br />As noted above, all alternatives included additional, planned, capacity on TH 36, 1-694 <br />and 1-35W (south on TH 36). <br /> <br />In addition to the basic 1-35W alternatives, sub-alternatives were analyzed for the TH 10 <br />"Diagonal" between 1-694 and 1-35W. The sub-alternatives included: <br /> <br />1. Grade-separating the current at-grade intersection ofTH 10 and CSAH 96 with an <br />interchange between TH 10 and the TCAAP area in the vicinity of Prior Avenue. <br /> <br />2. "Down-grading" the TH 10 "Diagonal" to eliminate or minimize the amount of <br />regional through-traffic on that segment. <br /> <br />Figures 2 through 5 show the forecast ADT for the basic 1-35W alternatives. A <br />significant increase in traffic is expected between now and 2025 given the growth in <br />development in the study area plus the additional regional traffic from the TH 10/610 <br />corridor and 1-35W north of the study area. Traffic on 1-35W is expected to increase by <br />approximately 60 percent between 2000 and 2025 under the baseline alternative, or about <br />1.9 percent per year. <br /> <br />e <br /> <br />As capacity is increased under the additional-Iane-on-I-35W options, the forecast <br />volumes are expected to increase, as expected. The increase is generally 10,000-to <br />l2,000-vehicles per day for the one-lane addition; this would translate into approximately <br />1,800 to 2,000 vehicles per hour over six hours in the peak direction and a reflection in <br />pent-up demand that can not be accommodated under existing capacity. The two-lane <br />addition alternative increases demand generally by 6,000 to 8,000 per day. <br /> <br />. <br /> <br />1-35W/I-694ITH 10ITH 36 <br />Transportation Deficiency Study <br /> <br />-7- <br /> <br />SRF Consulting Group, Inc. <br />July 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.