My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-16-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-16-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:25 PM
Creation date
11/13/2006 4:05:43 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />future 95th Avenue North park-and-ride lot and services within the corridor connecting <br />the Rosedale/Twin Lakes area, TeAAP site and Blaine. <br /> <br />Capacity And level Of Service Assumptions <br /> <br />Forecast model capacity assumptions were slightly modified to account for operational <br />considerations. The default model assumptions do not distinguish an auxiliary lane from <br />a general traffic lane; however, it is known that auxiliary lanes function differently, and at <br />a lower capacity, than through-lanes. A Level of Service D capacity (beginning of slow- <br />and-go congestion) was used in the model to maintain calibration ofthe model <br />parameters. The assumptions used were as follows: <br /> <br />. Inside lane 2300 vehicles per hour <br />. Middle lane 1950 vehicles per hour <br />. Outside lane 1650 vehicles per hour <br />· 1950 vehicles per average freeway lane <br />. Auxiliary lane 1400 vehicles per hour <br />. 1100 vehicles per lane TH 10 diagonal (expressway) <br /> <br />. <br /> <br />. <br /> <br />1-35W/I-694ITH toITH 36 <br />Transportation Deficiency Study <br /> <br />-6- <br /> <br />SRF Consulting Group, Inc. <br />July 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.