<br />. <br /> <br />4 <br />September 12, 2002 <br />Joint Maintenance Facility <br /> <br /> <br /> Adolfson & Pelerson <br /> Construction/Collaborative $730,389 $637,931 70,515 21,943 730,389 <br /> Desi n Grou IRNL Desi n <br /> Knutson Construction <br /> ServicesiKodet Architectural $798,745 697 ,634 77,114 23,997 798,745 <br /> Grou <br /> Kraus-Anderson Construction $318,930 278,557 30,791 9,582 318,930 <br /> Co an IOertel Arcbitects <br /> McGou hi Architectural Alliance $776,000 677,768 74,918 23,314 776,000 <br /> M.A. Mortenson <br /> Company/BWBR Architects, $880,400 768,953 84,997 26,450 880,400 <br /> Inc. <br /> us Northwest, L.L.C. $580,000 506,580 55,995 17,425 580,000 <br /> PCL Construction Services, $548,550 479,111 52,959 16,480 548,550 <br /> IncJSetter Leacb & Lindstrom <br /> R anl1v!iIIer Dunwiddie $652,500 569,902 62,995 19,603 652,500 <br />. Witcher Construction $450,707 393,653 43,513 13,541 450,707 <br />CompanylBKV Group <br /> <br />. <br /> <br />At the end of Phase I, the City of Arden Hills will need to make a decision about a Special Use <br />Permit, as well as commit to Phase II services. Phase II services would complete the <br />construction drawings and prepare plans and specifications to go out for bid for construction. <br />Our assumption at this point would be that the City will be asked to pay based on upon the same <br />percentage as Phase I services. At this time, Ramsey County has not indicated a cost range <br />estimate for those services. <br /> <br />The capital cost currently indicated are $1.9 million. This is based upon a preliminary space <br />needs study performed by TKDA. The preliminary plan for financing could be as follows: <br /> <br />Water Fund. ..... ...... ...... .... ...... ......... ..... .... .............. .... ............ ..... ...... ........ ...$600,000 <br />Sewer Fund .......... ............. .... ......... ...... ............ ... ............ ...... .... ....... .............600,000 <br />Storm Water Fund........ ..... .......................... ..... ... ....... ...... ,................... ....... ..600,000 <br />Municipal Lands & Buildings Fund (3 year total 02, 03, 04) ......................600,000 <br />Sale of Existing City Property (current public works site) ..........................600,000 <br />Total: $3.000.000 <br /> <br />This will allow for some change in the cost estimates and adjust for inflation to the year 2004. <br />The operational costs of $122,000 could be trimmed by reducing the amount of heated space. <br />With the reduction of 2,923 square feet, this would reduce our operating costs by $18,000. The <br />total cost would then be $104,710. These costs would be split between streets, parks <br />