My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-30-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-30-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:27 PM
Creation date
11/13/2006 4:05:58 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />An additional eastbound left turn lane at the intersection of the 1-694 ramps and <br />Lexington Avenue. <br /> <br />. If a north-south connection is extended north of CR 96 to CR I, a new lane <br />configuration is recommended to be built for the southbound movement at the <br />intersection of this connection and CR 96. <br /> <br />. <br /> <br />Improvements to Lexington Avenue, Guidant Drive South, Hamline Avenue and West <br />Floral Drive are not recommended due to low cross street volumes and signal spacing <br />constraints. <br /> <br />Future Build Conditions <br /> <br />Traffic Forecasts/Trip Generation <br /> <br />The traffic analysis for future (2005 and 2020) Build conditions incorporates the <br />background traffic growth assumptions used in the No-Build analysis plus estimated trips <br />that will be generated by the proposed Guidant Campus expansion. The 1997 ITE Trip <br />Generation manual was used as the basis for trip estimates. With the additional <br />office/limited industrial space to be added to the campus in 2005 (Phase n, there will be <br />approximately 1,893 total trips in the A.M. peak and 1,819 trips during the P.M. peak by <br />comparison to the existing (2002) and 2005 No-Build 1,541 A,M. peak and 1,401 P.M. <br />peak total trips. In 2020, (full build-out scenario), the additional office/limited industrial . <br />space will result in approximately 3,261 total trips in the A.M. peak and 3,120 total trips <br />during the P.M. peak. <br /> <br />The directional trip distribution for the site-generated traffic was determined based on <br />information provided by Guidant on current employee home addresses and likely travel <br />routes for those employees as well as actual traffic counts and the regional travel demand <br />model that is based on individual cities' planned growth, The 2005 site trip distribution <br />during the A.M. peak hour estimates 47.9 percent of the trips to the campus originate from <br />the north and 52.8 percent originate from the south. During the P.M. peak hour, 59.2 <br />percent of the trips leave the campus and travel south and 41.5 percent travel to the north. <br />The 2020 site trip distribution during the A.M. peak hour estimates that 48.0 percent of the <br />trips to the campus originate from the south and 52.7 percent originate from the north, <br />During the P,M, peak hour, 59.5 percent of the trips leave the campus and travel south and <br />41.1 percent travel to the north. <br /> <br />Projected 2020 Build ADT volumes are as follows: <br /> <br />. CR F ~ 15,100 ADT <br />. CR 96 = 26,100 ADT <br />. Hamline Avenue = 16,000 ADT <br />. Lexington Avenue = 24,400 ADT <br />. 1-694 = 135,000 ADT <br /> <br />. <br /> <br />Guidaut Campus Master Plan <br />Draft AUAR <br /> <br />.35 - <br /> <br />September 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.