My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-30-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-30-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:27 PM
Creation date
11/13/2006 4:05:58 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Roadway Improvements <br /> <br />In addition to the roadway improvements assumed in the 2005 No-Build condition, the <br />2005 Build condition assumes that existing Guidant Drive North will be turned over to the <br />City and will become a public street requiring the street to be modified to meet the City of <br />Arden Hills public street design standards. These improvements will likely require a traffic <br />signal to be added to the intersection of Guidant Drive North and Lexington Avenue. <br />Traffic signal timing was also assumed to be optimized along Lexington A venue to <br />account for the higher volumes of traffic being experienced on the roadway network due to <br />the Guidant Campus site growth. The roadway geometry for the 2020 Build conditions are <br />the same as the 2005 Build conditions, with the addition of a north-south connection being <br />extended north of CR 96 to CR I. This improvement was also assumed in <br />the 2020 No-Build. <br /> <br />Traffic Operations Analysis <br /> <br />Tables II and 12 display the results of the signalized and unsignalized intersection analysis <br />for the 2005 and 2020 Build traffic conditions. With limited public improvements planned <br />between 2005 and 2020 and traffic volumes estimated to increase, the LOS at roadways <br />will continue to decline and the majority of intersections will experience a LOS E or F by <br />2020. <br /> <br />TABLE 11 <br />FUTURE BUILD A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS <br />LOS RESULTS - SIGNALIZED INTERSECTIONS <br /> <br />Signalized Intersection Build (2005) Build (2020) <br />A.M. P.M. A.M. P.M. <br />Lexington Avenue & Guidanl Drive North A A E B <br />Lexington A venue & CR F C B F F <br />Lexington Avenue & Victoria St A A A A <br />Lexington Avenue & WB 1-694 Ramps B C D F <br />Lexington Avenue & EB 1-694 C F D F <br />Lexington Avenue & CR 96 D D F F <br />Hamline Avenue & CR 96 C D F F <br /> <br />Guidant Campus Master Plan <br />Draft AUAR <br /> <br />-36- <br /> <br />September 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.