My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-30-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 09-30-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:27 PM
Creation date
11/13/2006 4:05:58 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />27. <br /> <br />COMPATIBILITY WITH PLANS <br /> <br />. <br /> <br />EAW: <br />IS THE PROJECT SUBJECT TO AN ADOPTED LOCAL COMPREHENSIVE LAND <br />USE PLAN OR ANY OTHER APPLICABLE LAND USE, WATER, OR RESOURCE <br />MANAGEMENT PLAN OF A LOCAL, REGIONAL, STATE, OR FEDERAL <br />AGENCY? NO l YES <br /> <br />IF YES, IDENTIFY THE APPLICABLE PLAN(S), DISCUSS THE COMPATIBILITY <br />OF THE PROJECT WITH THE PROVISIONS OF THE PLAN(S), AND EXPLAIN <br />HOW ANY CONFLICTS BETWEEN THE PROJECT AND THE PLAN(S) WILL BE <br />RESOLVED. IF NO, EXPLAIN. <br /> <br />AUAR: <br />The AUAR must include a statement of certification from the RGU that its comprehensive <br />plan complies with the requirements set out at 4410.3610, Subpart 1. <br /> <br />The AUAR document should discuss the proposed AUAR area development in the context <br />of the comprehensive plan. If this has not been done as part of the responses to Items 6, 9, <br />19, 22, and others, it must be addressed here; a brief synopsis should be presented here if <br />the material has been presented in detail under other items. Necessary amendments to <br />comprehensive plan elements to allow for any of the development scenarios should be <br />noted. If there are any management plans of any other local, state, or federal agencies . <br />applicable to the A UAR area, the document must discuss the compatibility of the plan with <br />the various development scenario studies, with emphasis on any incompatible elements. <br /> <br />The City of Arden Hills certifies that its 1982 Comprehensive Development Plan and final <br />1998 Comprehensive Plan (conditionally adopted by the Metropolitan Council pending <br />approval of the City's Local Storm Water Management Plan) are consistent with the <br />requirement set out in 4410.3610, Subpart 1, including a land use plan; a public facilities <br />plan (including transportation, sewer and water supply systems); and an implementation <br />program. <br /> <br />The proposed project is consistent with the existing and proposed land use plans identified <br />in the City of Arden Hills adopted 1982 and 1998 Comprehensive Plans as well as the <br />zoning for this area (see Figures 5 - 9). The 1982 and 1998 Comprehensive Plan zoning <br />maps identify the proposed campus and areas north and south of the campus <br />as I-I (Limited Industrial District). The purpose for an I-I (Limited Industrial District) is <br />to allow only those types and intensities of industrial uses that do not detract from the <br />surrounding area and to maintain performance standards to keep the intensity of land <br />utilization lower than in the general Industrial District. The Guidant Master Plan proposes <br />the development of the campus within an area currently used for office/limited industrial <br />and maintains a "green" buffer between the campus and adjacent land uses in conformity <br />with zoning and existing and proposcd land uses. <br /> <br />. <br /> <br />Guidant Campus Master Plan <br />Draft AUAR <br /> <br />- 55- <br /> <br />September 2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.