My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-28-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 10-28-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:31 PM
Creation date
11/13/2006 4:06:35 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS SPECIAL CITY COUNCIL MEETING MINUTES <br />SEPTEMBER 30, 2002 <br /> <br />6 <br /> <br />tit <br /> <br />that the City will come back to the residents with more information as they <br />proceed with the permanent solution on the potential for assessment. He reiterated <br />that the expectation of the City is that the benefiting properties would pay half of <br />the cost of the permanent solution which was approximately $21,250 based on the <br />engineer's estimate of$42,500. <br /> <br />A resident inquired about the property that was shown that did not have a <br />structure or an address associated with it. The Mayor indicated that this is <br />the City park and the City would contribute based upon the value <br />determined and would pay an assessment much like a residential piece of <br />property. <br /> <br />A resident commented that storm drainage does come from outside the <br />Karth .Lake neighborhood and wondered if the City will take that into <br />consideration. The Mayor indicated that the Council will direct staff to look <br />for all of those properties that contribute storm water and receive a benefit <br />from the lowering of Karth Lake. . <br /> <br />A resident expressed appreciation to the City Council for their willingness <br />to listen and to invite the residents and affected properties in to a meeting, <br />and urged the City Council to proceed with a solution. <br /> <br />Council Member Aplikowski inquired how the right level of the lake will be <br />determined. Based upon the information they received tonight, the Council has <br />heard that the ordinary high water mark is 929 feet, the City would pump down to <br />a level of 934 feet. The current level of the lake is 938 feet. City Engineer Brown <br />responded that the City would work with the DNR to determine the correct level <br />of the work and they would pump down to the level as determined by the permit. <br />He did indicate there is no guarantee pumping would not need to be done again <br />and that no problems will be created by pumping down the lake. <br /> <br />Council Member Grant indicated that there is another scenario to be considered. If <br />there is heavy winter snowfall, and early spring rain, the lake could be <br />significantly impacted. <br /> <br />Council Member Aplikowski agreed with the statement that was raised earlier . <br />about problem identification. She would like to see the problem verbally <br />identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.