My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-16-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 12-16-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:37 PM
Creation date
11/13/2006 4:07:31 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ARDEN HILLS PLANNING COMMISSION - DECEMBER 4, 2002 <br /> <br />4 <br /> <br />. 7. <br /> 8. <br /> 9. <br /> 10. <br /> II. <br /> 12. <br /> 13. <br /> 14. <br /> IS, <br /> 16. <br /> 17. <br /> 18. <br />. <br /> 19. <br /> <br />Any new sanitary sewer line that connects to the line at the sonthwest corner of <br />the site be located three (3) feet above the existing line and then dropped in to <br />reach the existing line. <br />A final grading and drainage plan be submitted to the City Engineer for his <br />approval. <br />A detail stormwater management plan shall be submitted to the City Engineer for <br />his approval. <br />A masonry trash enclosure shall be provided using materials that match the <br />primary building. <br />The applicant shall provide the city with an easement for the lift station located at <br />the southwest corner of the site. <br />The applicant shall provide the city with a signage easement at the corner of <br />County Road E2 and Cleveland Avenue for a Gateway Sign. <br />The applicant shall provide and install sidewalks adjacent to the public right-of- <br />way along both the north and west side of the property. <br />The applicant shall provide a bicycle rack adjacent to the sidewalk along the front <br />of the building. <br />A PUD Permit and Development Agreement be approved by the City Council <br />prior to the issuance of a building permit. <br />The applicant obtains all necessary permits from Ramsey County. <br />Compliance with the applicable provisions ofthe Zoning Ordinance. <br />If necessary, further review of parking requirements be conducted within a six <br />month to one year period to determine if the estimated traffic and parking <br />required for the proposed building is consistent with the Building and <br />Professional Office use. <br />That any exterior signage not on the building be a monument style sign, reviewed <br />by staff and subject to the City's signage ordinance. <br /> <br />The motion carried unanimously (5-0). <br /> <br />PLANNING CASE #02-33 - MANUFACTURER'S SERVICES PLANNED UNIT <br />DEVELOPMENT AMENDMENT <br /> <br />Chair Sand opened the public hearing at 7:50 p.m. <br /> <br />Staff stated applicant was requesting review of an amendment to a Planned Unit <br />Development to replace a 1,500-gallon nitrogen storage tank with a 13,OOO-gallon <br />nitrogen storage tank and the accompanying vaporizers. Staff reviewed their report dated <br />25, 2002 and recommended approval of the Planned Unit Development Amendment <br />subject to conditions as ontlined in their report. <br /> <br />Mike Buseman, Manufacturers' Services, stated this situation had arisen due to the <br />economic situation. <br /> <br />. <br /> <br />Commissioncr Ricke asked how tall was the tank in relation to the building, Mr. <br />Buseman replied the tanks would be 2-3 feet short of the building wall. He noted the <br />horizontal tank would be less intrusive and not above the elevation of the building. <br /> <br />Commissioner Zimmerman thanked applicant for adding the additional screening. He <br />noted the only thing that would not be screened was the seven feet of the top of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.