My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 12-16-2002
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2002
>
CCP 12-16-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:37 PM
Creation date
11/13/2006 4:07:31 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~ <br />??Ji <br /> <br />MANUFACTURERS' <br />SERVICES <br /> <br />October 30, 2002 <br /> <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112-5794 <br /> <br />Dear City Officials: <br /> <br />Manufacturers' Services moved to 4300 Round lake Road in August of 1997. /iJ that time two above <br />ground Nitrogen tanks were installed on the southwest side of our facility. One for Liquid Nitrogen and <br />the other for Gaseous Nitrogen. <br /> <br />We are a contract Manufacturer of electronic printed circuit boards. Our Customer base changes quite <br />frequently. A most recent customer's requirements will double both our liquid and gaseous Nitrogen <br />usage to process their boards. This will constitute an increase in both liquid and gaseous nitrogen. To <br />accommodate this Manufacturers' SelVices is proposing: <br /> <br />1 . Removing our smaller 1, 500 gallon tank from our s~e, (Picture #1 ) <br /> <br />2. Moving our larger 3,000 gallon tank to the spot that smaller tank was located. <br /> <br />3. Installing a horizontal 13,000-gallon tank in front of the 3,OOO-gallon tank and vaporizers. This <br />will allow us to have larger volumes of liquid/gas nitrogen delivered less frequenOy to our site. <br />We have chosen a horizontal tank over a vertical tank, as the vertical tank would tower over <br />the height of the building. The vaporizers are 23 feet high. The current screening is 16' high. <br />Screening will extend around the new area. <br /> <br />This last year deliveries have occurred 2.79 per week. Our expected usage will double once we are in <br />full production. If a larger tanks is not installed our deliveries would be daily with some 2-3 times per <br />day. <br /> <br />We appreciate the working relationship with the City of Arden Hills. We believe this proposed <br />opportunity solution will blend with the building and the surroundings. We would like to start this project <br />before the severe weather season. Please let us know off any steps we can take to support this <br />approval process. <br /> <br />..~~ <br /> <br /> <br />Suzanne Compton <br />Facilities SupelVisor <br /> <br />lI1ANUFACTVRERS' SERVICES <br />CENTRAL U. S. OPERATIONS, INC. <br />4300 ROUND LAKE ROAD <br />ARDEN HILLS, MINNE'_<;OTA USA <br />55tl2 <br /> <br />651.604_2400 <br />fAx: 6S t .604.2420 <br />
The URL can be used to link to this page
Your browser does not support the video tag.