My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
95-024
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
1990-1999
>
1995
>
95-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:17:58 PM
Creation date
11/14/2006 1:29:17 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~~IS~ <br /> <br />I . <br />('OISlLTING IlIGlNEERS <br /> <br />1326 Energy Perk Drive <br />SI, Peul, MN 55108 <br />611-644.4389 <br />1,800,888.1923 <br />Fex: 612-644-9446 <br /> <br />CIVIL ENGiNEERING-_ <br />.V1RONMENTAl <br />, NICIPAl <br />PlANNING <br />SCUD WASTE <br />STRUCTURAL <br />SURVEYING <br />TRAFFIC <br />TRANSPORTATION <br /> <br />ElECTRICAUMECHANICAL <br />ENGINEERING: <br />HVA( <br />POWER DISTRIBUTION <br /> <br />SCADA <br />SYSTEM CONTROlS <br /> <br />eFICESIN: <br />MINNEAPOLIS <br />PRIOR LAKE <br />S1. PAUL <br />W ASECA <br /> <br />March 17, 1995 <br />File: 520-055-10 <br /> <br />~v1pJ~. _21 19'01:, <br />- v <br /> <br />-UJ t <br /> <br />;",.r;:} ,: (; :-; ~ ~_ L:' <br /> <br />Mr. Brian Fritsinger <br />City of Arden Hills <br />1450 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: MUNICIPAL ST ATE AID AND <br />RAMSEY COUNTY TURNBACK ISSUES <br /> <br />Dear Mr. Fritsinger: <br /> <br />This letter was prepared to address several issues concerning the referenced subjects. The <br />first of which is the turnback of Stowe A venue. As noted at Monday night's City Council <br />meeting, I met with Mr. Tim Mayasich of Ramsey County Public Works on Tuesday, <br />March 14, 1995. As a result of that meeting, the enclosed sample resolution is submitted <br />for your consideration. As indicated in the feasibility study for the reconstruction of Stowe <br />Avenue, Ramsey County has proposed to use Option #2 for the turnback, resulting in the <br />anticipated 100% funding of County eligible funds for that portion of the project. That <br />amount is estimated at approximately $100,000, but may vary slightly based upon bids <br />received and actual construction costs. More importantly, the project can proceed this <br />summer as outlined in that report. <br /> <br />The second issue is the County's desire to have maintenance and construction responsibility <br />for Hamline Avenue from Floral Drive to T.H. 96, and West County Road F from <br />Harnline Avenue to Lexington Avenue, turned back to the County from the City of Arden <br />Hills. As it has been proposed to seal coat Hamline A venue, we recommend deleting that <br />portion of the 1995 Street Maintenance project at a potential savings to the City of <br />approximatley $22,000 to $25,000. <br /> <br />Finally, upon resolution of these issues, we need to finalize the designation of Municipal <br />State Aid Streets for the City by May 1, 1995. This is typically required prior to March 1; <br />however, the County has provided the MnDOT State Aid office with a list of all proposed <br />turnbacks in the County to delay that reporting date until May 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.