Laserfiche WebLink
<br />, ,-,'.~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />'. . <br /> <br />~HNSON <br />C~LS ~#11Y'u." <br />~~! <br /> <br />Mounds View Schools <br />Pinewood Elementary School <br />Final Commissioning Report <br />Introduction <br />20 August 2002 <br /> <br />The following report contains a brief description of Testing Procedures and Methods used <br />in commissioning this project. An overview of the design intent and a summary of each <br />major mechanical equipment item and its performance and a Statement of Certification <br />signed by the Commissioning Authority. Field Installation, Operational and Functional <br />Performance data on all heating, ventilation and air conditioning systems, including the <br />Building Automation System and additional information pertaining to system balancing <br />will be delivered under separate cover as well as a soft copy on CDIROM. <br /> <br />Every effort was made during the Commissioning Process to ensure the Design Intent <br />was met. <br /> <br />1broughout the construction process numerous deficiencies have been discovered. The <br />Commissioning Team has forwarded these to the appropriate parties for resolution. A <br />copy of the list is attached to this report. We have also prepared a graph, which displays <br />the type of deficiency and associated responsibility. <br /> <br />2 <br />