Laserfiche WebLink
<br />.' " <br />" ,-. <br /> <br />Johnson Controls, Inc. <br />Commissioning Report <br /> <br />Basic Procedures <br /> <br />Physical Inspection: All systems are to be checked for compliance with the mechanical <br />engineers specifications and the submittals approved by the construction management <br />team. <br /> <br />Field Installation Verification: Field Verification of all equipment installed per plan <br />detail and manufacture's recommendations. <br /> <br />Operational Testing: Verification that all equipment has received proper startup <br />procedure. <br /> <br />Functional Testing: Quality assurance testing of equipment to assure design intent. <br />Equipment will be spot checked throughout facility to assure proper system operation. <br /> <br />Device Testing: Calibration testing of input and output devices is to be spot checked <br />throughout facility to determine accuracy of the installed devices within specified limits. <br /> <br />Testing Equipment: Temperature and Humidity instruments used in testing the noted <br />areas will be tested with hand held digital temperature indicator/sensor. The Electro- <br />therm Model SRH77 A, manufactured by Cooper Instrument Corporation is to be used. <br />This instrument is to be calibrated by a factory representative on an annual basis. <br /> <br />3 <br /> <br />. <br /> <br />. <br /> <br />. <br />