Laserfiche WebLink
<br />'. <br /> <br />Pinewood Elementary School <br />Final Commissioning Report <br />Certification <br />20 August 2002 <br /> <br />The Commissioning Team certifies that all systems will operate within the design intent <br />of the contract documents, provided outside air conditions are at or below the design <br />limits of the installed equipment. <br /> <br />The Commissioning Team further certifies that all systems will adequately ventilate the <br />spaces regardless of the outside air conditions. <br /> <br />Certified on 20 August, 2002 by: <br /> <br /> <br />./ <br /> <br />Timoth . O'Brien <br />Commissioning Authority <br />Johnson Controls, Inc. <br /> <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />5 <br />