My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-21-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 01-21-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:07 PM
Creation date
11/14/2006 2:33:55 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />ae <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />and Ramps #4 (1,335 cars) and #7 (2,142 cars). The proposed development will add <br />1,029,000 square feet of office/limited industrial space to the existing 1,158,893 square <br />foot of office/limited industrial uses for a total of 2,187,893 square feet of office/limited <br />industrial. To accommodate the additional parking demand on the campus, seven new <br />parking ramps will be constructed and will provide 7,027 parking spaces. The proposed <br />development will also include 615 surface parking spaces. The proposed parking spaces <br />will replace the existing 3,331 surface parking spaces, resulting in a net increase <br />of 4,31l parking spaces. Figure 4 shows the Master Plan for development of the Guidant <br />Campus through 2019. Table I shows the worst-case development scenario assumptions <br />for intensity and staging of development within the AUAR study area. <br /> <br />TABLE 1 <br />STAGING AND INTENSITY OF THE PROPOSED DEVELOPMENT <br /> <br />Staging <br />Existing (2002) <br /> <br />Intensity <br /> <br />1,158,893 GSF office/limited industrial <br />(includes Building 0) <br />3,331 surface parking spaces* <br /> <br />Phase I (2005) <br /> <br />419,800 GSF office/limited industrial <br />1,500 parking ramp stalls <br /> <br />Phase II (20 I 0) <br /> <br />332,000 GSF office/limited industrial <br />2,050 parking ramp stalls <br /> <br />Phase ill (20l5) <br /> <br />277,200 GSF office/limited industrial <br />3,477 parking ramp stalls <br /> <br />2,187,893 GSF office/limited industrial <br />7,027 parking ramp stalls and 615 surface <br />parking spaces <br /> <br />* All but 615 surface lot parking spaces of the existing 3,331 will be replaced by parking ramp stalls through <br />a phased process to meet the parking demands of the added office space. Surface parking areas may not be <br />replaced by the parking ramps but may be replaced by other cover types. (Refer to Item 10 for more <br />information on cover types.) <br /> <br />Total <br /> <br />INFRASTRUCTURE <br /> <br />Infrastructure improvements to facilitate the development of the Guidant Campus include <br />transportation and storm water conveyance/treatment systems. The City of Arden H ills has <br />confirmed that the existing water and sanitary sewer service to the site has the capacity for <br />the additional proposed campus needs. <br /> <br />Guidant Campus Master Plan <br />Final AllAR and Mitigation Plan <br /> <br />January 2003 <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.