My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-21-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 01-21-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:07 PM
Creation date
11/14/2006 2:33:55 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
View images
View plain text
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />1\ <br />,- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.e <br />I <br /> <br />Table 10 displays the results of the unsignalized intersection analysis for the 2005 and <br />2020 No-Build traffic conditions. Four intersections will experience LOS E or F in <br />2005 and 2020. It should be noted that these four intersections also experience LOS E or F <br />under existing (2002) conditions. <br /> <br />TABLE 10 <br />FUTURE NO-BUILD A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS <br />LOS RESULTS - UNSIGNALlZED INTERSECTIONS <br /> <br /> No-Build No-Build <br />Unsignalized Intersection* (2005) (2020) <br /> A.M. P.M. A.M. P.M. <br />Lexington Ave & Guidant Drive North F F F F <br />Hamline Avenue & CR F F F F F <br />Lexington Avenue & Guidant Drive South E F E F <br />Fernwood Avenue & CR F B C C D <br />East Dr & CR F B C C D <br />WestDr&CRF B B B B <br />Hamline & West Floral Drive F F F F <br /> <br />*Note: Unsignalizcd LOS shows the worse LOS for the stopped movement. <br /> <br />No-Build Conclusions <br /> <br />The cause of the declining LOS from 2005 to 2020 at many of the intersections is the <br />increase in background traffic volumes and the lack of planned improvements on the <br />adjacent roadways. In order to obtain a LOS D or better at these intersections, additional <br />roadway improvements would need to be implemented. The following improvements are <br />recommended to improvc traffic operations on adjacent roadways: <br /> <br />2005 Recommended Improvements: <br /> <br />. <br /> <br />An additional northbound left turn lane at Lexington Avenue/CR F. <br /> <br />A southbound and northbound right turn lane at the intersection of the I-694 ramps with <br />Lexington Avenue. <br /> <br />Installation of traffic signals at Lexington Avenue/Guidant Drive North and Hamline <br />Avenue/CR F. <br /> <br />. <br /> <br />. <br /> <br />2020 Recommended Improvements: <br /> <br />A dedicated westbound right turn lane at Hamline Avenue/CR F. <br /> <br />(JuiJant Campus Master Plan <br />Final AUAR and Mitigation Plan <br /> <br />- 34 - <br /> <br />January 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).