Laserfiche WebLink
<br />Memo to City Council <br />January 17,2003, Ramsey County Public Works Facility Cost Comparison <br />Page 2 of2 <br /> <br />Cost-Comparison <br />Staff has taken a look at the Operations and Maintenance study completed by Toltz, King, Duvall, <br />Anderson (TKDA) dated June 2002, and prepared a side by side comparison of the amount of <br />space indicated and the cost outlined with that being proposed by BWBRIM.A. Mortenson. The <br />space analyzed in the TKDA study had different descriptions and outlined space differently than <br />the one by Ramsey County. Staff has done some combining to show comparison on the amount of <br />space and indicated it is roughly equivalent to the space in the new study. <br /> <br />Tvne of Snace TKDA Studv RAMSEY CO.! BWBR <br />Heated Building Area 2,065 3,974 <br />Support Area 1,849 0 <br />Heated Vehicle Area 14,649 17,070 <br />Shop Area 3,074 .0 <br />Cold Storage 2,261 2,984 <br />Salt/Sand 10,500 0 <br />Site Area (no rough equivalent in the <br /> amount of sq. ft.) <br /> 7,800 *$574,487 <br /> <br /> TKDA RAMSEY CO./BWBR <br /> Square Cost Per Subtotal Square Cost Per Subtotal <br /> Feet Square Feet Square <br /> Foot Foot <br />Heated <br />Space 2,065 $108.15 $223,330 3,974 $122.33 $486,139 <br />Supported <br />Area 798 $92.70 $73,975 <br /> 532 $103.00 $54,796 <br /> 306 $154.50 $47,277 <br /> 213 $56.65 $12,066 <br /> $411,444 $486,139 <br />Vehicle <br />Storage 3,024 $77.25 $233,604 17,070 $77.02 $1,314,731 <br /> 14,690 $56.65 $832, 189 $1,061,204 <br />Cold <br />Storage 2261 $36.05 $81,509 2,984 $52.44 $156,481 <br />Site Area 7,800 $1.80 $14,040 $574,487 <br /> $1,796,116 $2,531,838 <br />15% <br />Contingency $269,417 $379,776 <br />Total $2,065,533 $2,911,614 <br /> <br />e <br /> <br />e <br /> <br />. <br />