My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-24-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 02-24-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:12 PM
Creation date
11/14/2006 2:34:21 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'~l <br />'7(, <br />~ <br /> <br />'_./ <br /> <br />The task force reviewed various fonts for the lettering to be provided with the sign, <br />including Helvetica bold which is the approved City font. The task force discussed <br />the aesthetics of these different fonts, based on that the City Council would be <br />discussing this topic at its upcoming worksession. To this end, the task force <br />recommends that the City consider using Windsor font on the entry way signage. <br /> <br />The task force then reviewed various materials and colors for the retaining walls <br />which would support the entry way signs. The task force concluded that cut stone <br />pieces of granite, which is a waste product of the manufacturing process, would look <br />like a "dry-tit" limestone wall but with more quality for approximately the same <br />price. The task force concluded that the rainbow colored granite would be most <br />aesthetically pleasing. The task force also suggested that at-grade lighting be <br />provided behind the retaining walls to provide directional lighting at the sign face. <br /> <br />The task force recommends that the City pursue the mature evergreen landscaping <br />on the Twin Cities Army Ammunition Plant (TCAAP) to include behind the signs. <br />The task force also recommends the inclusion of annual planting beds with retaining <br />walls to help visually define the entry signs, Lastly, the task force recommends <br />..pursuing .the assistance of Ramsey. County for surplus dirt for .berming,at the <br />Lexington Avenue sign, given Ramsey County's current road construction in the <br />area. <br /> <br />5, <br /> <br />REVIE\V CONCEPT DESIGN FOR MEDIAN LANDSCAPING <br />Mr. Sanders provided a concept design for the median landscaping along Highway <br />96. The concept groups the overstory landscaping that is proposed by Ramsey <br />County forinclusion in the median. The concept would add accent ornamental trees <br />at the ends of these groups with low level shrubs beneath the ornamental trees. <br /> <br />- <br /> <br />The task force discussed the relative advantages and disadvantages of a high (turf) <br />and a low (native grasses) maintenance ground cover in the median. The provision <br />of a high maintenance ground cover would require underground irrigation <br />(approximately $50,000) and weekly mowing, However, the high maintenance <br />ground cover would provide for a very aesthetically pleasing median. The provision <br />of a low maintenance median would be more cost effective, but would provide for <br />an unkept look to the median. The task force recommends that the City Council <br />include the turf with underground irrigation the preferred ground cover for the <br />median. <br /> <br />6. FORMULATE RECOMMENDATIONS FOR CITY COUNCIL <br />CONSIDERA nON <br />The task force then summarized various findings that they had made since April of <br />1997. The task force will be presenting these findings to the City Council on <br />Monday, December 8,1997. <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.