Laserfiche WebLink
<br />'. <br /> <br />Arden Hills City Hall <br />Final Equipment testing report <br />Introduction <br />February 4, 2003 <br /> <br />The following report contains a brief description of Testing Procedures and <br />Methods used in testing the equipment for this project. An overview of the design <br />intent and a summary of each major mechanical equipment item and its <br />performance are included in this report. Field installation, operational and <br />functional performance data on all heating, ventilation and air conditioning <br />systems, including the Building Automation System and any additional <br />information pertaining to the systems will be delivered under this cover. <br /> <br />Every effort was made during the Commissioning Process to ensure the Design <br />Intent was met. <br /> <br />Throughout the commissioning process numerous deficiencies have been <br />discovered. Copies of these lists are attached to this report. Any mechanical <br />deficiencies found during our inspections are noted on the final mechanical <br />deficiency list and any recommendations associated with this list can be found <br />under the section called Mechanical Recommendations. All deficiencies found <br />during the functional testing of the equipment are noted in the Function Test <br />section for each piece of equipment. Any recommendations made for the <br />functionality ofthe equipment are made in the System Overview section. <br />