Laserfiche WebLink
<br />'1 <br />1 <br />1 <br />'1 <br />1 <br />'J <br />] <br />J <br />] <br />] <br />J <br />] <br />] <br />o <br />!J <br />U <br />U <br /> <br />Applies <br />o <br /> <br />If <br /> <br />~ <br /> <br />[J <br />U <br /> <br />'. <br /> <br />Johnson Controls, Inc. <br />Commissioning Report <br />Basic Procedures <br /> <br />. <br /> <br />Doesn.t Apply <br />o Field Installation Verification: Field Verification of <br />all equipment installed per plan detail and <br />manufacture's recommendations, <br /> <br />o Operational Testing: Verification that all equipment <br />has received proper <br />startup procedure. <br /> <br />o Functional Testing: Quality assurance testing of <br />equipment to assure <br />design intent. Equipment will be spot checked <br />throughout facility to assure proper system operation. <br /> <br />. <br /> <br />. <br />