My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-31-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 03-31-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:18 PM
Creation date
11/14/2006 2:34:55 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D. <br />~NSON <br />r.--~ <br />n <br />n <br />o <br />o <br />o <br />o <br />o <br />~ <br />o <br />o <br />o <br />o <br />o <br />D <br />o <br />. <br />11 <br />U <br /> <br />Functional Test <br /> <br />Project: Arden Hills City Hall <br /> <br />Equipment Tag: AHU-1 <br /> <br />Party filling out this form & witnessing GreQ Zernechel <br /> <br />Date of test: 30 Jan 03 <br /> <br />Air handler 1 is the largest air handler in the facility_ This unit serves the main areas of <br />the building providing tempered air to eleven variable air volume boxes serving the main level <br />work areas and offices. <br />This unit is not operating according to the original design specifications as described in <br />section 3.08 in control section 15950. Furthermore, the current operation of the unit does not <br />match the sequence of operation as described in the as"built drawings delivered to the owner <br />from the controls contractor. <br />Please see this section for further information on all observations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.