Laserfiche WebLink
<br />"1 <br />1. <br />] <br />J <br />] <br />] <br />] <br />] <br />] <br />]. <br />1 <br />] <br />] <br />] <br />] <br />J <br />J. <br />J <br />1 <br /> <br />Arden Hills City Hall <br />. Final Commissioning Report <br />Systems Summary <br />February 4, 2003 <br /> <br />All installed mechanical systems have been inspected for installation verification, <br />operational and functional performance. <br /> <br />The following systems are not operating as per the as-built drawings and/or the <br />specifications as described in section 15950 commission number 1997149.02 <br />issued for bid April 24, 2000: <br />1. Building automation system <br />2. Air handling unit #1 <br />3. Air handling unit #2 <br />4. Air handling unit #3 <br />5. Boiler and heating pumps <br /> <br />A detailed description of each system and any discrepancies are included in this <br />report. <br />