My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-19-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 05-19-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:25 PM
Creation date
11/14/2006 2:35:58 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Arden Hills <br /> <br />. <br /> <br />This rate shall apply, regardless of the street's classification (local, <br />collector, arterial, trunk highway); designation (County State-Aid <br />Highway, Municipal State-Aid Street); or jurisdiction (State, County <br />or City). <br /> <br />The commercial/industrial equivalent assessment rate shall be based <br />on seventy percent (70%) of the cost of a bituminous overlay plus all <br />associated overhead costs for a typical commercial street section. This <br />commercial/industrial equivalent assessment rate shall be determined <br />by the City Council, and established by resolution on an annual basis, <br />based upon comparable project data available to the City. <br /> <br />4. <br /> <br />Allev <br />All new alley construction or reconstruction shall be 100% assessed to the <br />abutting properties. The assessment shall be on a per unit basis for the <br />property frontage on the alley. <br /> <br />. <br /> <br />5. Appnrtenances <br />Appurtenances such as sidewalks, street lighting, trees or other <br />landscaping features are often encountered during street improvement <br />projects. Appurtenances to new street construction, street reconstruction <br />or bituminous overlay improvements that are either existing or needed by <br />the City shall be included in the cost ofthe street improvement project. <br /> <br />Appurtenances constructed or provided in areas along an improvement <br />project where they do not currently exist, shall be one hundred percent <br />(100%) assessed to the benefiting properties on a per unit basis. The cost <br />of these appurtenances shall be separated from the cost of the street <br />improvement project. All costs of ornamental street lighting and/or any <br />lighting shall be one hundred percent (100%) assessed to the benefiting <br />properties on a per unit basis. <br /> <br />6. MaintenancelRehabilitation Proiects <br />a. Concrete Pavement Restoration <br />Concrete pavement restoration is a maintenance procedure funded by <br />the City. <br /> <br />b. Crack Sealing <br />Crack sealing is a maintenance procedure funded by the city. <br /> <br />c. Bituminous Seal Coating <br />Bituminous seal coating is a maintenance procedure funded by the <br />City. <br /> <br />. <br /> <br />d. Bituminous Surface Patcbing <br /> <br />2003 Assessment Policy Manual- Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.