My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-27-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 05-27-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:26 PM
Creation date
11/14/2006 2:36:03 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />4. Land use Density or Intensity. <br />The current site area is 41.89 acres or 1,824,885 SF. <br />The proposed building areas are: <br /> <br />Stage 3-Main Building: <br />Existing SF <br />92,200 <br />66,750 <br />2,080 <br />162,030 <br /> <br />First Floor <br />Second Floor <br />Third Floor <br />Total <br /> <br />New Proposed SF <br />149,300 <br />81,900 <br />3.000 <br />234,200 <br /> <br />Stage 4 - Retreat Center: <br /> <br />First Floor <br />Second Floor <br /> <br />Total All Buildings <br /> <br />New Proposed SF <br />32,800 <br />32.800 <br />65,600 <br /> <br />. <br /> <br />Total SF <br />241,500 <br />148,650 <br />5,080 <br />395,230 <br /> <br />Total SF <br /> <br />65,600 <br />460,830 SF <br /> <br />460,830 SF -;- site area of 1,824,885 SF = 0.25 Floor area ratio <br /> <br />. <br /> <br />This is less than 0.30 FAR maximum allowed for R-l District <br /> <br />The site coverage area is based on the following: <br /> <br />Stage 3 <br />Main Building <br />First Floor <br />Stage 4 <br />Retreat Center/ <br />First Floor <br /> <br />Existing SF <br /> <br />New Proposed SF <br /> <br />Total SF <br /> <br />241,500 <br /> <br />32.800 <br />274,300 <br /> <br />274,300 SF area -;- 1,824,885 SF Site area = 15% lot coverage <br />Maximum lot coverage for R-l District = 40% <br />As a comparison maximum lot coverage for a B-2 District=25%. <br /> <br />92,200 <br /> <br />149,300 <br /> <br />5. Development and Staging Schedule: <br />Stage 3 is contingent on fundraising efforts, but anticipated at this time <br />to start construction some time in 2004. <br /> <br />o <br />Total <br /> <br />32,800 <br /> <br />Stage 4 is estimated to start 2012. <br /> <br />April 4. 2003 <br /> <br />North Heights Lutheran Chnrch <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.