My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-27-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 05-27-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:26 PM
Creation date
11/14/2006 2:36:03 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />;. <br /> <br />North Heights Traffic Impact Study <br />Alliant Engineering. Inc. <br />AprilS, 2003 <br /> <br />. 5.0 Future Conditions and Traffic Operations Analysis <br /> <br />Background traffic volumes were developed for the weekday PM peak period and for the time <br />periods above by adjusting the background traffic volumes up by 2% per year to develop year <br />after opening no-build traffie volumes (Year 2(05). Foreeast volumes including site traffic was <br />developed by distributing the site traffic to the roadway system based on the directional <br />distribution and adding the site volumes to the background traffic. The forecast volumes are <br />included in the appendix in Table A-I. <br /> <br />The analysis takes into account the proposed Highway 96 roadway geometrics, and the proposed <br />site plan. Development of the site on the north side of Highway 96 was not taken into account. <br />The intersection level of service is documented in Table 6 and 7 below. <br /> <br />Table 6 <br />Year 2005 No-Build Conditions <br />Intersection Level of Service <br /> <br />. <br /> <br /> PM Peak Event - Enterinl! Event - Exitinl! <br /> Overall Minor Overall Minor Overall Minor <br /> Intersec- Street Intersec- Street Intersec- Street <br />Intersection tion Left Turn tion Left Turn tion Left Turn <br />Highway 96 at North A E A D A n.a.* <br />Entrance <br />East Entrance at North A A A A A B <br />Snelling Avenue <br />Highway 96 at North A E A E A F <br />Snelling Avenue . <br /> <br />The results of the analysis indicate that. under Year 2005 no-build conditions. traffic operations <br />will continue to be very similar to the existing conditions. Traffic control will continUe to be <br />required for major events. <br /> <br />. <br /> <br />120f 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.