My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 05-27-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 05-27-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:26 PM
Creation date
11/14/2006 2:36:03 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,. <br /> <br />; <br /> <br />North Heights Traffic Impact SlUdy <br />Alliant Engineering, Inc. <br />April 5, 2003 <br /> <br />Table 7 <br />Year 2005 Build Conditions <br />Intersection Level of Service <br /> <br />. <br /> <br /> PM Peak Event - Entering Event - Exiting <br /> Overall Minor Overall Minor Overall Minor <br /> Intersec- Street Left Intersec- Street Intersec- Street Left <br />Intersection tion Turn tion Left Turn tion Turn <br />Highway 96 at North A E A D A n.a,* <br />Entrance <br /> , <br />East Entrance at North A A A A A D** <br />Snelling A venue <br />Highway 96 at North A E A E A n.a. * <br />Snelling A venue <br /> <br />* Traffic Control Required <br />** Traffic Control May be Required <br /> <br />The results of the analysis indicates that the key intersections will operate at acceptable levels <br />during the typical weekday PM peak period, and that traffic control personnel will be. required <br />during special events. <br /> <br />. <br /> <br />6.0 Conclusions <br /> <br />. Weekdav PM Peak Hour - The proposed expansion has little or no impact on the typical <br />PM peak weekday traffic volumes and corresponding traffic operations, No additional <br />improvements or other mitigation is required. <br /> <br />. Soecial Events - At special events where parking is near capacity, the north church <br />entrance at Highway 96 and the south approach of the North SnellinglHighway 96 <br />intersection will experience long delays without traffic control personnel present. It is <br />estimated that it will take about an hour to clear the parking lot. <br /> <br />If traffic control personnel are present, the intersections would operate. as if they were <br />signalized. Delays for the Church entrance would decrease significantly, and the parking <br />lot could be cleared in approximately one half hour. <br /> <br />. Sundav Service - Sunday traffic conditions were not analyzed. However, the amount of <br />traffic and the background traffic volumes are very similar to a Special Event. For near <br />capacity crowds, it may take 45 to 60 minutes to clear the parking lot without traffic <br />control personnel present. Services should be spaeed to avoid overlapping traffic flows, <br />at least 45 minutes apart. <br /> <br />. <br /> <br />13 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.