My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-09-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 06-09-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:27 PM
Creation date
11/14/2006 2:36:08 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />URS <br />. <br /> <br />June 4, 2003 <br /> <br />AGENDA ITEM 7.B <br /> <br />Mr. Aaron Parri sh <br />City Administrator <br />City of Arden Hills <br />1245 West Highway 96 <br />Arden Hills, MN 55112 <br /> <br />RE: 2003 Pavement Management Program <br />Ingerson and Karth Lake East Neighborhood <br /> <br />Dear Mr. Parri sh: <br /> <br />Bids were received and opened for the above-referenced project on June 4, 2003. Bids were <br />received from three (3) contractors. The tabulated bid outcome is as follows: <br /> <br />. <br /> <br />1 <br />2. <br />3. <br /> <br />Contractor <br />Amt Construction Company, Inc. <br />Palda and Sons, Inc. <br />T.A. Schifsky and Sons, Inc <br /> <br />Bid Amount <br />$1,903,147.60 <br />$1,943,372.91 <br />$1,963,359.90 <br /> <br />Bid Amount <br />$1,903,536.10 <br />$1,943,372.92 <br /> <br />Engineer's Estimate <br /> <br />$2,082,000.00 <br /> <br />All bids had proper bid guarantees in the amount of ten percent (10%) of the total bid as required <br />by the Project Manual. A bid tabulation was performed to verify the total bid amounts and two <br />corrections were made which changed prices but did not effect the outcome of the bid. A copy of <br />the bid tabulation is attached for your information. <br /> <br />Amt Construction Company, Inc. submitted the low base bid with a total base bid amount of <br />$1,903,536.10. The low bid is approximately $178,500 (9.4%) less than the Engineer's Estimate <br />and reflects a competitive bid in the current marketplace. <br /> <br />Ingerson Court Recommendation <br />The project as bid includes the reconstruction of Ingerson Court. The City Engineer still <br />recommends the reconstruction of Ingerson Court for the following reasons: <br /> <br />. The Pavement Condition Index (PCI) rating of 47 is well within the reconstruction <br />range. <br /> <br />. <br /> <br />. Ingerson Court does not have curb and gutter therefore it does not meet City <br />standards. The PMP policy does not promote milling and overlaying streets that do <br />not meet city standards. <br /> <br />Thresher Square' 700 Third Street South. Minneapolis, MN 55415' Phone: (612) 370-0700' Fax: (612) 370-1378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.