My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-14-2003
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2003
>
CCP 07-14-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:18:31 PM
Creation date
11/14/2006 2:36:29 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C'-,. <br />{, ' <br /> <br />c. <br /> <br />te <br /> <br />, <br />ARDEN HILLS CITY COUNCIL - FEBRUARY 14, 2000 <br /> <br />12 <br /> <br />Staff met with Dan Solar from Ramsey County Public Works and received written comments <br />and a drawing pertaining to thc tratIic at the Bethel College entrance (Exhibit B). Staff has also <br />included 1998 traffic counts from County Road E to County Road E2 (Exhibit C). <br /> <br />Ms. Randall presented the drawing of the proposed layout of the intersection and the road beyond <br />the intersection. She noted that for northbound traffic, the road widens to two lanes south of <br />McCracken Lane. For southbound traffic, the road reduces to one lanc prior to McCracken Lane. <br />The proposed traffic signs would include three crosswalk signs. <br /> <br />Ms. Randall stated that the design of the roadway had been worked on over the last three years in <br />conjunction with City staff, Bethel College and Ramsey County. The City staff and <br />representatives of Bethel College have since left. Ramsey County was open to modifications of <br />the roadway and intersection, however, the County feels that the proposal will adequately serve <br />the intersection. <br /> <br />Ms. Randall presented the proposed landscaping plan. Mayor Probst asked what landscaping <br />shown on the plan wa~ new and what was existing. Ms. Randall stated that all landscaping on <br />the plan would be new. She explained the locations of the existing vegetation. Mayor Probst <br />asked if the trees along the west side of the tennis courts currently exist. Ms. Randall stated that <br />those trees would be added to thc site. <br /> <br />Ms. Randall stated that the City of Arden Hills currently has a natural trail that cnters across the <br />Bethel College property. The City owns the property along the west side of the Bethel property <br />for the trail, however, when thc trail was constructed it was not all placed on City property. Staff <br />has reviewed the cxisting trail and recommends the trail remain in its current location (except for <br />a slight modification around the proposed tennis courts). Relocating the trail to thc City property <br />location would require removal of several trees. Bethel College ha~ stated that they are <br />comfortable with the trail remaining on their property. Staff would recommend a trail easement <br />be drafted by Bethel College and granted to the City for the trail to remain in approximately the <br />same location. <br /> <br />Staff had drawn on paper the approximate location of the existing trail and a proposed relocation <br />for the trail (Exhibit E). A neighbor has placed several stakes on the property indicating property <br />corners, City property, Bethel property and the tennis courts. The stakes are closc, however, are <br />not accurate. Bethel College has also marked the areas and there was a five to seven foot <br />difference in the northwest corner of the tennis courts. <br /> <br />Bethel College has provided staff with additional information on the proposed use of the West <br />Athletic Field Complex and potential pedestrian traffic (Exhibit F). <br /> <br />Ms. Randall advised that the Planning Commission recommended approval of Phuming Case <br />#00-0 I, Special Use Permit amendment and Site Plan Review, conditioned on: <br /> <br />1. <br />2. <br /> <br />Execution ofa new Special Use Permit Document 00-01. <br />Dedication of a trail easement for the existing trail to be prepared and recorded by the <br />applicant and approval by staff. <br />Compliance with the height ordinancefDr structures. <br /> <br />3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.